Evigia Systems, Inc.

3810 Varsity Drive
Ann Arbor, MI 48108
http://www.evigia.com
15 Employees

SBIR Award Summary

Total Number of Awards 22
Total Value of Awards $8.9MM
Active Awards 1 valued at $750K
First Award Date 01/01/05
Most Recent Award Date 03/20/17

Key Personnel

Last Name Name Awards Contact
Gogoi Dr. Bishnu Gogoi 1
Yazdi Dr. Navid Yazdi 29 Message
Cole Dr. Vernon Cole 1 Message

22 Awards Won

Phase 2 SBIR Active

Agency: Department of Homeland Security
Topic: H-SB016.1-005
Budget: 03/20/17 - 03/19/19

The proposed SBIR Phase II project continues the development of a highly-reliable, modular, and cost-effective wide-area flood sensor network system. The senor nodes operate on IEEE802.15.4 wireless physical layer, and an enhanced energy-efficient 6LoWPAN (IPv6 over Low power Wireless Personal Area Networks) open-standard mesh protocol. The sens...

Phase 2 SBIR

Agency: Department of Defense
Topic: SB152-005
Budget: 09/30/16 - 09/29/17

This proposed SBIR Phase II project continues the development of ovenized inertial MEMS sensors (OI-MEMS) technology and development of a tactical-grade MEMS inertial measurement units (IMU) with significant, size, weight and power (SWaP) advantage over presently available off-the-shelf IMUs. The specifications of this IMU address the need in mi...

Phase 1 SBIR

Agency: Department of Homeland Security
Topic: H-SB016.1-005
Budget: 05/02/16 - 11/01/16

The proposed SBIR Phase I effort initiates the development of a highly-reliable, modular, and cost-effective wide-area flood sensor network system. Evigia leverages the EVX-1000 family of wireless mesh networked sensor system developed for remote rugged arctic oil-spill recovery operation to develop the proposed flood alert IoT system. The senor...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA15-026
Budget: 04/25/16 - 11/24/16

Inertial measurement units (IMUs) in flight systems (interceptors, airborne platforms, and space assets) are constrained by limits on size, weight, power and cost (SWaP-C), and are also exposed to severe shock and vibration during storage, transport, launch, staging, deployment and engagement. This combination of requirements has proven difficul...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB152-005
Budget: 09/29/15 - 06/30/16

This proposed SBIR Phase I effort initiates the development of ovenized inertial MEMS sensors (OI-MEMS) to achieve the tactical performance requirements of MEMS inertial measurement units (IMUs), in particular bias and scale factor stability for military, aerospace and high-end industrial and commercial markets. The primary outcome of the propos...

Phase 2 SBIR

Agency: Army
Topic: A14-006
Budget: 09/28/15 - 09/27/16

This SBIR Phase II project aims to develop an ultra-low power miniature light-weight high-functionality multi-sensor health monitoring system that meets the requirements for long term (10-20 years) health management and condition based maintenance of military ordnance and sensitive equipment, including advanced missiles and guided ordnance. This...

Phase 1 SBIR

Agency: Department of Homeland Security
Topic: H-SB015.1-002
Budget: 01/01/15 - 12/31/15

The proposed SBIR Phase I effort initiates the development of a low-cost tamper-proof electronic bolt seal that is easy to install, and provides electronic recording and reporting without increasing the inspection time at the customs and security checkpoints. The proposed e-seal addresses the present gap in seal protecting ALL the air and mariti...

Phase 1 SBIR

Agency: Army
Topic: A14-006
Budget: 01/01/14 - 12/31/14

This proposed SBIR Phase I effort initiates development of an ultra-low power miniature light-weight high-functionality multi-sensor health monitoring system that meets the requirements for long term (10-20 years) health management and condition based maintenance of military ordnance and sensitive equipment, including advanced missiles and guide...

Phase 2 SBIR

Agency: National Science Foundation
Topic: IC-2012
Budget: 01/01/12 - 12/31/12

SBIR/STTR ERC Collaborative Proposal: #1128726 SBIR PI: Navid Yazdi (Evigia Systems, Inc); Phase II Proposal #0956908; SBIR PD: Murali Nair ERC: Wireless Integrated Microsystems (WIMS) Engineering Research Center; University of Michigan; Yogesh Gianchandani, Director NSF invites funding requests from current Small Business Innovation Research an...

Phase 2 SBIR

Agency: Navy
Topic: N092-100
Budget: 09/27/11 - 03/04/13

The proposed SBIR Phase II project is to develop miniature light-weight high-functionality multi-sensor systems that meet the requirements for prognostics and health management of military equipment, and their life cycle management and conditionbased maintenance. The systems integrate temperature, shock, and humidity sensors with low-power CMOS ...

Load More