Anautics, Inc.

2360 NW 32nd
Tri-city, OK 73065
http://www.anautics.com
41 Employees

SBIR Award Summary

Total Number of Awards 19
Total Value of Awards $7.05MM
First Award Date 09/02/03
Most Recent Award Date 08/31/15

Key Personnel

Last Name Name Awards Contact
Johnson Dr. Sandra Scaffetta Johnson 1 Message
Johnson Mr. Michael Johnson 15 Message
McEndree Mr. Joe McEndree 1 Message
Gaston Dr. Billy Gaston 1
Johnson Mike Johnson 1 Message
S. Johnson S. 1 Message
Wilson Dee Wilson 1 Message

19 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF151-162
Budget: 08/31/15 - 05/31/16

ABSTRACT:An organizational culture that promotes problem solving is necessary for success in any organization. Nondestructive Inspection (NDI) is the inspection of a structure or component in any manner that will not impair its future usefulness. The purpose of the inspection may be to detect flaws, measure geometric characteristics, determine m...

Phase 2 SBIR

Agency: Air Force
Topic: AF112-208
Budget: 09/30/13 - 09/30/15

ABSTRACT: The proposed solution would provide the United States Air Force (USAF) a thin client application for proactively identifying problem parts. Our solution is dependant on a digital Bill of Materials (BOM) which we also provide a tool for importing and loading the cleansed parts structure from the data cleansing teams. Our solution was ab...

Phase 1 SBIR

Agency: Air Force
Topic: AF112-208
Budget: 12/21/11 - 10/21/12

ABSTRACT: The engineer will be guided through the creation of criteria, alternatives and evaluation techniques in order to make a better decision. BENEFIT: The engineer will be guided through the creation of criteria, alternatives and evaluation techniques in order to make a better decision.

Phase 2 SBIR

Agency: Air Force
Topic: AF093-193
Budget: 11/14/11 - 11/14/13

ABSTRACT: As we move from a paper-based world into a digital environment, the internet will soon evolve from a virtual documentation system into a vibrant ecosystem of data where documents and human actors play an even smaller role. We are currently reaching a tipping point in history concerning data: more data is being manufactured by machines,...

Phase 2 SBIR

Agency: Air Force
Topic: AF083-229
Budget: 07/15/10 - 07/15/12

The Engineering Decision Support Framework (EDSF) will provide an engineer a SEAM based process lifecycle to implement detailed analysis of problem reports, assistance requests, requirements and other issues issues encountered. The engineer will be guided through the creation of criteria, alternatives and evaluation techniques in order to make a...

Phase 1 SBIR

Agency: Air Force
Topic: AF093-193
Budget: 04/27/10 - 01/27/11

The ability of humans to make complex decisions is one of the most interesting aspects of human intelligence, especially when judgemental, ambiguous, absense, or erratic knowledge is concerned. This project focuses on the development of a methodology to classify multi-attribute alternatives into evidence blocks for evaluation in automated decisi...

Phase 1 SBIR

Agency: Air Force
Topic: AF083-229
Budget: 03/18/09 - 12/18/09

As the Air Force (AF) begins the progression of applying systems engineering from the top-level definition of the system architecture down to a granular level of design it is very important to also realize the changes that will be taking place through Technology Insertion initiatives. Continuous system engineering is required to preserve the int...

Phase 2 SBIR

Agency: Air Force
Topic: AF05-265
Budget: 03/05/08 - 03/05/10

The Global War on Terrorism is increasing pressure for DOD depots to expedite the return of serviceable weapon systems to the warfighter while maintaining or decreasing maintenance costs. Each military service has responded to this challenge by undertaking enterprise-wide logistics modernization programs. Efficient data capture and programmati...

Phase 2 SBIR

Agency: Air Force
Topic: AF06-330
Budget: 03/04/08 - 03/04/10

Many Department of Defense (DoD) weapon systems are operating beyond their original design specifications, resulting in failures requiring unplanned parts, materials and sustainment procedures. Such U.S. Air Force weapon systems are collectively denoted as aging aircraft. A large number of aging aircraft in conjunction with newer weapon system...

Phase 1 SBIR

Agency: Air Force
Topic: AF06-327
Budget: 11/14/06 - 08/14/07

The main goal of this work is to develop a more reliable, robust, and accurate measurements of radome transmission properties. As a result, we propose a pilot study in order to design a two-horn testing system and provide several prototype radome testing measurements. The proposed two-horn testing system will be mainly focused on transmission ...

Load More