Wavefront Sciences, Inc.

15100 Central Ave SE, Suite C
Albuquerque, NM 87123
10 Employees

SBIR Award Summary

Total Number of Awards 5
Total Value of Awards $1.08MM
First Award Date 04/25/97
Most Recent Award Date 09/30/05

Key Personnel

Last Name Name Awards Contact
Neal Dr. Daniel R. Neal 5

5 Awards Won

Phase 2 STTR

Agency: Department of Health & Human Services
Topic:
Budget: 09/30/05 - 08/31/07

The long-term objective of our project is to design, build, and market an ophthalmic instrument that simultaneously measures corneal topography, corneal aberrations, and whole-eye optical aberrations of the human eye using wavefront sensing technology. From these measurements our instrument will provide a complete description of the refractive p...

Phase 2 STTR

Agency: Department of Health & Human Services
Topic:
Budget: 09/01/04 - 08/31/05

The long-term objective of our project is to design, build, and market an ophthalmic instrument that simultaneously measures corneal topography, corneal aberrations, and whole-eye optical aberrations of the human eye using wavefront sensing technology. From these measurements our instrument will provide a complete description of the refractive p...

Phase 1 SBIR

Agency: Department of Health & Human Services
Topic:
Budget: 09/30/02 - 03/29/04

DESCRIPTION (provided by applicant): Although the average accuracy of autorefractors is very good, they still cannot be reliably used to write eyeglass prescriptions because about 20 percent of patients will be measured differently by subjective refraction by at least 0.5 diopters. Further, the patients that are measured differently have the sam...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: BMDO99-001
Budget: 06/18/99 - 12/17/99

The bandwidth of current generation communications and adaptive optics is limited by the bandwidth of the either mechanical or electronic systems. There are a number of new applications that would be enabled if this bandwidth could be significantly increased. This includes adaptive optics for seeker window turbulence correction for Theater Mis...

Phase 1 SBIR

Agency: Air Force
Topic: AF97-029
Budget: 04/25/97 - 01/25/98