Seemann Composites, Inc.

PO Box 3449
Gulfport, MS 39505
http://seemanncomposites.com
70 Employees

SBIR Award Summary

Total Number of Awards 7
Total Value of Awards $3.38MM
First Award Date 01/01/96
Most Recent Award Date 06/09/08

Key Personnel

Last Name Name Awards Contact
Charbonnet Mr. Sid Charbonnet 4 Message
Seemann William H. Seemann 3

7 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N06-128
Budget: 06/09/08 - 06/08/10

Current riverine craft are built in aluminum. Although aluminum is an obvious candidate material for a riverine operating environment, innovative solutions that deliver structural weight reduction to enable higher speeds, greater payload and increased survivability are always desired. Advanced lightweight composite structural armor concepts, ...

Phase 1 SBIR

Agency: Navy
Topic: N06-128
Budget: 01/11/07 - 11/30/07

The riverine requirements outlined by NAVSEA dictate that a composite material hull with innovative integral armor solutions and C4ISR may be required to meet the mission objectives. This response to the Phase I SBIR solicitation presents information on concepts for a Composite Armored Riverine Boat (CARB) offered by a team of industry leaders:...

Phase 2 SBIR

Agency: Navy
Topic: SOCOM96-002
Budget: 03/24/05 - 03/23/07

Composite structures for submarines require high strength and high fracture toughness to survive underwater shock blasts. These structures have historically been built using rubber-toughened epoxy pre-impregnated (pre-pregs) reinforcements. However, experience has shown that pre-pregs can be difficult to work with, especially for thick section...

Phase 1 SBIR

Agency: Navy
Topic: N04-093
Budget: 05/10/04 - 11/10/04

Z-axis stitching offers improved performance and greatly increased damage tolerance for composite to composite joints (CTC). Z-axis stitching is employed in aircraft applications using complex, double-sided stitch machinery developed by NASA. This technology is very expensive, but offers increased damage tolerance to airframe structures. The ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 97-2
Budget: 01/01/97 - 12/31/97

Phase 1 SBIR

Agency: Special Operations Command
Topic: SOCOM96-002
Budget: 12/20/96 - 06/20/97

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 96-1
Budget: 01/01/96 - 12/31/96