Tpl, Inc.

100 VIA FLORENCE
Newport Beach, CA 92663
6 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $752K
First Award Date 01/01/90
Most Recent Award Date 01/01/93

Key Personnel

Last Name Name Awards Contact
Perry Mark L Perry 1
Harrah Larry A. Harrah 4
stoller Nancy e. stoller 2
Stoller Harold M. Stoller 31 Message

6 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 93-2
Budget: 01/01/93 - 12/31/93

LEAKS IN CRYOGENIC TRANSFER LINES CAUSE LOSS OF VACUUM INSULATING PROPERTIES. OPERATIONAL REQUIREMENTS DICTATE THE DEVELOPMENT OF A REPAIR PROCESS IN PLACE. COMPONENT MATERIALS AND OPERATIONAL ENVIRONMENTS IMPOSE SEVERE IMPEDIMENTS TO ADHESIVE MECHANISMS FOR REPAIR MATERIALS. A CERAMIC COATING IS PROPOSED AS A REPAIR MATERIAL. IN-PLACE FORMATION...

Phase 1 SBIR

Agency: Navy
Topic: N91-104
Budget: 01/21/92 - 07/21/92

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1991
Budget: 01/01/91 - 12/31/91

RESEARCHERS AT THE NSF-SPONSORED CENTER FOR MICRO-ENGINEEREDCERAMICS/UNIVERSITY OF NEW MEXICO HAVE DISCOVERED A LOW DENSITY, ANOMALOUSLY LOW SURFACE AREA, SOL-GEL DERIVED ALUMINA-SILICATE COMPOSITION. THEIR EFFORTS ARE FOCUSED ON UNDERSTANDING THE MOLECULAR PROCESSES BY WHICH THIS UNIQUE CHARACTERISTIC IS OBTAINED. THE DEVELOPMENT OF A LOWSURFAC...

Phase 1 SBIR

Agency: Navy
Topic: N89-166
Budget: 11/21/90 - 12/31/90

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1990
Budget: 01/01/90 - 12/31/90

CURRENT HIGH ENERGY RADIATION DETECTOR DEVICES, SUCH AS SCINTILLATORS, SEMICONDUCTOR DETECTORS AND GAS IONIZATION DETECTORS, CANNOT SIMULTANEOUSLY PROVIDE HIGH SPEED AND HIGHENERGY RESOLUTION MEASUREMENTS. MANY APPLICATIONS (E.G., IMPROVED NEUTRON ACTIVATION ANALYSIS) WILL EMERGE IF RADIATION DETECTORS WITH BOTH FAST RESPONSE AND HIGH RESOLUTION...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90