Saddleback Aerospace

3611 262nd Ave SE
Issaquah, WA 98029
15 Employees

SBIR Award Summary

Total Number of Awards 8
Total Value of Awards $2.66MM
First Award Date 01/23/96
Most Recent Award Date 01/29/99

Key Personnel

Last Name Name Awards Contact
Sherman Matthew M. Sherman 2
Fryers Jack M. Fryers 2
Hassapis Chris V. Hassapis 3
Paquette David G. Paquette 1

8 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF98-238
Budget: 01/29/99 - 01/29/99

Advancing technology for aircraft turbine engines, as defined in the IHPTET initiative, will place increasingly severe thermal and structural demands on the components of the engine hot section. Materials technology is currently being developed with the goal of satisfying the demands of IHPTET Phase III and the future concepts engine. Although t...

Phase 1 SBIR

Agency: Air Force
Topic: AF98-238
Budget: 04/02/98 - 02/02/99

Advancing technology for aircraft turbine engines, as defined in the IHPTET initiative, will place increasingly severe thermal and structural demands on the components of the engine hot section. Materials technology is currently being developed with the goal of satisfying the demands of IHPTET Phase III and the future concepts engine. Although...

Phase 2 SBIR

Agency: Air Force
Topic: AF96-176
Budget: 05/29/97 - 05/29/99

A Phase I program was conducted to develop a new thermal protection concept for strut/cowl leading edges in the engine inlet region of hypersonic flight vehicles. It is planned that detailed evaluations of the concept be obtained in a simulated high performance flight environment in a Phase II ground test program at the GASL Test Leg I facility...

Phase 1 SBIR

Agency: Navy
Topic: N97-056
Budget: 05/02/97 - 11/02/97

Phase 2 SBIR

Agency: Army
Topic: A95-114
Budget: 02/11/97 - 06/11/99

Currently slip rings are used to transmit data and power across the rotating rotor interface of helicopters. However, slip rings have not proven to be as reliable as desired in these applications. Data dropouts and noisy measurements occur to an unacceptable degree and frequency. In this Phase I exploratory development effort Saddleback Aeros...

Phase 1 SBIR

Agency: Air Force
Topic: AF96-176
Budget: 04/25/96 - 01/25/97

Phase 1 SBIR

Agency: Air Force
Topic: AF96-071
Budget: 04/01/96 - 04/01/97

Phase 1 SBIR

Agency: Army
Topic: A95-114
Budget: 01/23/96 - 07/23/96