Qualtech Systems, Inc.

100 Corporate Place Array
Rocky Hill, CT 06067
http://www.teamqsi.com
25 Employees

SBIR Award Summary

Total Number of Awards 78
Total Value of Awards $28.8MM
First Award Date 01/01/95
Most Recent Award Date 09/13/16

78 Awards Won

Phase 1 SBIR

Agency: Army
Topic: A16-037
Budget: 09/13/16 - 03/12/17

QSI, leveraging its extensive experience in diagnostics and prognostics of complex NASA, military and commercial systems through its commercial software toolset TEAMS (Testability Engineering and Maintenance System) and research on power quality monitoring and mission planning, seeks to develop a data-driven, self-learning software framework, fo...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: H6.04
Budget: 06/10/16 - 12/09/16

Autonomous, avionic and robotic systems are used in a variety of applications including launch vehicles, robotic precursor platforms, etc. Most avionic innovations are based on software-embedded systems, and this has resulted in an increase in the number of interactions (coupling) among heterogeneous subsystems. Avionic systems degrade in perfor...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: S5.05
Budget: 06/10/16 - 12/09/16

Fault Management (FM) is a key enabler of system autonomy critical to reducing overall operations costs of increasingly complex science missions while ensuring their success. NASA has invested significant effort and has developed a draft FM Handbook to improve FM design, development, V&V and operations processes. While the FM Handbook provides r...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: A1.06
Budget: 06/10/16 - 12/09/16

NASA has invested significant effort in the past decade in developing and maturing technologies that enable efficient and effective use of Next-generation (NextGen) Vertical Lift (VL) systems for a broad class of missions and operations. One of the key barriers it faces to the widespread use of VL vehicles within the National Airspace is the cos...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: S5.05
Budget: 04/29/16 - 04/28/18

Functional robustness, resulting from superior engineering design, along with appropriate and timely mitigating actions, is a key enabler for satisfying complex mission goals, and for enhancing mission success probability. Fault Management (FM) is a crucial mechanism to ensure system functionality from system design through the operational phas...

Phase 2 SBIR

Agency: Navy
Topic: N141-030
Budget: 04/22/16 - 04/22/18

Reliable operation of LCS computing systems are paramount to mission operations because unanticipated failures and system degradations result in the ships crew and subject matter experts (SMEs) spending extended time on debugging and resolving system issues. The need for reliability of large and complex computing environments has led to the deve...

Phase 1 SBIR

Agency: Army
Topic: A15-087
Budget: 11/21/15 - 05/14/16

This proposal describes a method to reduce the acoustic noise and torque ripple of a switched-reluctance machine by solving a multi-objective optimization problem. The physical limitations of the machine, namely voltage and temperature, are used as constraints, and these are related to the objectives of noise and torque variation. Electrical, me...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: S5.05
Budget: 06/17/15 - 12/17/15

Functional robustness, resulting from superior engineering design, along with appropriate and timely mitigating actions, is a key enabler for satisfying complex mission goals, and for enhancing mission success probability. Fault Management (FM) is a crucial mechanism to ensure system functionality from system design through the operational phas...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: A1.04
Budget: 05/18/15 - 05/17/17

In Phase II, the QSI-Vanderbilt team seeks to develop a system-level diagnostics and prognostic process that incorporates a "sense and respond capability," which first uses error codes and discrete sensor values to correctly diagnose the system health including degradations and failures of sensors and components, and then invokes appropriate pro...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: S5.05
Budget: 05/12/15 - 05/11/17

There has been a renewed push across NASA centers and programs to make Systems Engineering & Integration (SE&I) processes more efficient and results-oriented than the current cumbersome and expensive cross-checking processes using text documents, and transition to a repeatable and a cost-effective process of Model Based Systems Engineering (MBSE...

Load More