Axiom Technology International Corp.

1893 W. New Haven Avenue, #157
Melbourne, FL 32904
4 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $1.75MM
First Award Date 04/29/94
Most Recent Award Date 07/02/97

Key Personnel

Last Name Name Awards Contact
Hladky Mark Hladky 6

6 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N95-170
Budget: 07/02/97 - 07/02/99

An Electric Start System for an advanced ship propulsion gas turbine engine is offered as a drop-in replacement of the existing air turbine starter. The ESS technology will produce the required starting torque for the turbine engine, while operating at lower nominal speeds. This will significantly improve the start system reliability. The ESS...

Phase 1 SBIR

Agency: Navy
Topic: N95-170
Budget: 02/20/96 - 08/20/96

Phase 2 SBIR

Agency: Navy
Topic: N93-251
Budget: 12/21/95 - 12/21/97

The functional operation of an automated Electrical Load Management System for the V-22 Osprey will be demonstrated during the Phase II effort. Laboratory hardware will be fabricated that is operable for different mission types and over various flight profiles. The operation will be representative of the system control and interface through th...

Phase 1 SBIR

Agency: Army
Topic: A94-072
Budget: 03/13/95 - 09/13/95

The potential to reduce US Army tactical generator set weights and sizes will be explored through the combined application of High Frequency Alternators and Power Frequency Converters. The application of such technology will improve the mobility and deployability of the tactical equipment as performance requirements become more demanding. High...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB941-004
Budget: 07/06/94 - 12/28/94

As electric vehicles are becoming more popular, and new state regulations are requiring greater electric vehicle usage, techniques are required to make their operation more efficient. One method is to improve the efficiency of the motor controller. This may be accomplished by incorporating the latest component technologies into innovative...

Phase 1 SBIR

Agency: Navy
Topic: N93-251
Budget: 04/29/94 - 10/29/94