Electroimpact, Inc.

2721 NE Blakeley
Seattle, WA 98105
26 Employees

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $1.49MM
First Award Date 01/01/87
Most Recent Award Date 08/31/93

Key Personnel

Last Name Name Awards Contact
Hartmann John Hartmann 3
Zieve Peter Zieve 5
Zieve Dr. Peter B Zieve 1
smith Sam smith 2

9 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF93-163
Budget: 08/31/93 - 03/03/94

Phase 2 SBIR

Agency: Army
Topic: A90-143
Budget: 08/31/92 - 08/31/94

Advanced composites introduce new challenges for field repair. The ideal conditions for composite repair are to employ hard tooling with consolidation pressure and temperature conditions similar to an autoclave. Neither tooling or autoclaves are avialable in the field. The Conformal Magnetic Repair System (CMRS) is a flexible magnetic repair s...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-2
Budget: 01/01/91 - 12/31/91

AN INNOVATIVE AND UNIQUE DEICING SYSTEM IS PROPOSED WHICH ISWELL SUITED FOR COMPOSITE AIRCRAFT LEADING EDGES. HELICOPTER ROTORS, ENGINE INLETS, AS WELL AS MANY RECENTLY DESIGNED AIRCRAFT, ARE COMMONLY COMPOSITE. IN THE PROPOSED DESIGN A THIN SPIRAL COIL IS ENCAPSULATED IN ELASTOMER AND BONDED TO THE COMPOSITE LEAD EDGE. A THIN METAL STRIP IS FOR...

Phase 1 SBIR

Agency: Army
Topic: A90-143
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: Navy
Topic: N89-187
Budget: 09/21/89 - 12/31/89

Phase 2 SBIR

Agency: National Science Foundation
Topic: 1988
Budget: 01/01/88 - 12/31/88
PI: Unavailable

THE LOW PAYLOAD CAPACITY OF INDUSTRIAL ROBOTS, TYPICALLY UNDER 50 KG, HAS LIMITED THEIR USEFULNESS. A POTENTIAL SOLUTION TO THIS LIMITATION IS THE ELECTROIMPACT TOOL. POWERED BY CAPACITOR DISCHARGE A SMALL ELECTROIMPACT TOOL HAS RELIABLY GENERATED FORCE PULSES OF 80 KNT. THE ELECTROIMPACT TOOL IS A REFINEMENT OF THE ELECTROMAGNETIC RIVETER, A HA...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1987
Budget: 01/01/87 - 12/31/87
PI: Unavailable

Phase 1 SBIR

Agency: Navy
Topic: N87-198
Budget: 01/01/87 - 12/31/87