Robotic Systems Technology

4312 BLACKROCK ROAD
Hampstead, MD 21074
170 Employees

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $559K
First Award Date 12/05/91
Most Recent Award Date 12/18/98

Key Personnel

Last Name Name Awards Contact
Myers Scott Myers 2
Iseman Joseph Iseman 1
Shin Mimbo Shin 1

4 Awards Won

Phase 1 SBIR

Agency: Army
Topic: A98-073
Budget: 12/18/98 - 06/18/99

Light-weight rapid deployment military vehicles will require a high degree of crew survivability, by remoting crew members and providing vehicle control in addition to realistic imagery feedback. The problem is that realistic 3-D imagery is impossible to collect, transmit and reconstruct, without an inordinate amount of equipment, bandwidth and ...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB941-053
Budget: 07/12/94 - 02/13/95

The primary technical objective of the Phase I effort is to: design, analyze, and implement a Nestable Truss Structure (NTS) for innovative ocean structural applications, and to integrate the NTS with a robotic crane (RoboCrane) system for automated assembly and disassembly. The proposed tasks include: presenting the military system (and ...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB912-203
Budget: 11/16/92 - 11/16/93

THERE IS A GROWING REQUIREMENT TO REMOVE THE SOLDIER FROM THE HAZARDOUS BATTLEFIELD ENVIRONMENT AND REPLACE HIM WITH UNMANNED GROUND VEHICLES. PURE TELEOPERATION REQUIRES CONSTANT OPERATOR ATTENTION DURING "MENIAL TASKS" SUCH AS DRIVING, WHICH ELIMINATES ANY OF THE POTENTIAL FORCE MULTIPLICATION AVAILABLE WITH SINGLE OPERATOR/ MULTI-VEHICL...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB912-203
Budget: 12/05/91 - 05/15/92