Tricor Systems, Inc.

400 RIVER RIDGE DR
Elgin, IL 60123
31 Employees

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $709K
First Award Date 08/14/88
Most Recent Award Date 12/27/91

Key Personnel

Last Name Name Awards Contact
Buck Richard Buck 2
Conrad Gary L Conrad 1
Jereb John J Jereb 1

4 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N89-172
Budget: 12/27/91 - 12/27/93

A need exists for a long focal length, small, low cost sensor that can be operated beyond threat or visual detection range. A Phase I SBIR effort was conducted to determine the feasibility of a sensor capable of operating from a helicopter or unmanned vehicle. The study concluded that such a system was feasible based on vendor supplied data. The...

Phase 1 SBIR

Agency: Navy
Topic: N89-172
Budget: 11/06/89 - 12/31/89

Phase 1 SBIR

Agency: Air Force
Topic: AF88-086
Budget: 09/27/88 - 12/31/88

Phase 1 SBIR

Agency: Air Force
Topic: AF88-082
Budget: 08/14/88 - 12/31/88