Complere, Inc.

P.O. Box 541
Pacific Grove, CA 93950
6 Employees

SBIR Award Summary

Total Number of Awards 17
Total Value of Awards $3.25MM
First Award Date 01/01/83
Most Recent Award Date 01/01/08

Key Personnel

Last Name Name Awards Contact
Owen Dr. F K Owen 5
Owen F.K. Owen 2
Owen A.K. Owen 1
Owen Dr. F. Owen 5 Message
Owens Dr. F.K. Owens 2
Owen Kevin P. Owen 2 Message

17 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 08-2
Budget: 01/01/08 - 12/31/08

New wind tunnel flow quality test and analysis procedures have been developed and will be used to establish standardized turbulent flow quality measurement techniques and data reduction procedures for future flow quality studies in the National Transonic Wind Tunnel (NTF) and other Aeronautics Test Program (ATP) facilities. To date, few measure...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 07-1
Budget: 01/01/07 - 12/31/07

With increased commercial competition, great pressure is being applied to effect aerodynamic design changes that will improve fuel economy and performance. But, for example, as we are now concerned with small changes in drag count, potential sources of improvement are much more likely to be masked by poor flow quality. We may have reached the s...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 06-1
Budget: 01/01/06 - 12/31/06

A Hypersonic Gun Tunnel and laser based high speed imaging systems will be used to generate a unique, free flight, aerodynamic data base of potential Mars aeroshell configurations. These experiments will provide reliable bench mark data for CFD code validation and help aerocapture modeling and optimize aeroshell payload and design. The experim...

Phase 1 SBIR

Agency: Office of the Secretary of Defense
Topic: OSD96-015
Budget: 11/15/96 - 05/15/97
PI: A.K. Owen

Phase 1 SBIR

Agency: Navy
Topic: N92-110
Budget: 04/01/93 - 09/30/93
PI: F.K. Owen

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 93-1
Budget: 01/01/93 - 12/31/93

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 93-1
Budget: 01/01/93 - 12/31/93

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-2
Budget: 01/01/90 - 12/31/90

A MAJOR SOURCE OF TRANSONIC AND SUPERSONIC WIND TUNNEL TEST DATA UNCERTAINTY IS DUE TO ANGLE OF ATTACK MEASUREMENT ERRORCAUSED BY UNKNOWN STING AND BALANCE DEFLECTIONS UNDER LOAD. SINCE DYNAMIC LOADS IN THE UNITARY PLANFACILITIES GENERALLY EXCEED THOSE IN CONVENTIONAL LOW SPEED ATMOSPHERIC WIND TUN-NELS THE NEED TO ACCOUNT FOR THESE DISTORTIONS ...

Phase 2 SBIR

Agency: Air Force
Topic: AF87-120
Budget: 02/24/89 - 02/24/91

FUTURE PROGRESS IN THE COMPUTATION OF HYPERSONIC FLOW FIELDS IS RESTRICTED BY THE NEED FOR A RELIABLE TURBULENCE MODELING DATA BASE WHICH COULD BE USED FOR THE DEVELOPMENT OF EMPIRICAL MODELS FOR USE IN NAVIER-STOKES CODES. CURRENTLY, THERE ARE FEW COMPRESSIBLE FLOW MEASUREMENTS WHICH COULD BE USED FOR THIS PURPOSE AND, SINCE ADDITIONAL SHEAR S...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-2
Budget: 01/01/88 - 12/31/88
PI: Unavailable

AT PRESENT, PROGRESS IN COMPUTATIONAL FLUID DYNAMICS OF HIGHSPEED FLOWS IS RESTRICTED BY THE NEED FOR EXPERIMENTAL DATA WHICH CAN BE USED FOR THE DEVELOPMENT OF EMPIRICAL TURBULENCE MODELS AND TO VALIDATE NAVIER-STOKES CODES. ALTHOUGH SOME HOT WIRE DATA HAVE BEEN OBTAINED IN PREVIOUS YEARS, THEY ARE OF QUESTIONABLE RELIABILITY DUE TO THE ASSUMPT...

Load More