Javelin (old:lone Peak Engineering, Inc)

470 W. Lawndale Drive
Salt Lake City, UT 84115
9 Employees

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $1.6MM
First Award Date 09/30/93
Most Recent Award Date 09/25/98

Key Personnel

Last Name Name Awards Contact
Griffin Curtis Griffin 2

2 Awards Won

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB971-001
Budget: 09/25/98 - 09/24/00

Lone Peak Engineering successfully demonstrated the feasibility of direct, rapid fabrication of titanium components using two different SFF techniques, MetLAM and FDM in the Phase I project. Titanium alloy, Ti-6%A1-4% V parts, rapidly fabricated by these two SFF techniques, were sintered to high density with the desired a- structure. Lone Peak...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: DARPA92-033
Budget: 09/30/93 - 09/30/95

The opportunity to use one technique, laminated object manufacturing (LOM) as a base for a flexible manufacturing process for structural ceramics was identified by Lone Peak Engineering (LPE) in a Phase I SBIR proposal submitted to DARPA in January 1992. During the Phase I project, LPE demonstrated that advanced structu...