Computer Science & Applications, Inc.

2 CLIFFORD DRIVE
Shalimar, FL 32579
http://www.csainc.net
85 Employees

SBIR Award Summary

Total Number of Awards 12
Total Value of Awards $3.45MM
First Award Date 09/13/89
Most Recent Award Date 06/01/01

Key Personnel

Last Name Name Awards Contact
Lippert Mr. Jack Lippert 1 Message
Allen Clifford H. Allen Jr. 2
Allen Kim Allen 2
Crumly Freeland D. Crumly 7

12 Awards Won

Phase 1 SBIR

Agency: Navy
Topic: N01-010
Budget: 06/01/01 - 12/01/01

This proposal is to demonstrate the feasibility of a larger format resistor emitter array, greater than 544x672 pixels. Mega-pixel IR/EO emitter arrays allow higher resolution imagery to be utilized in the testing and performance evaluation of advanced IR array sensors. As both the pixel count and the framerate capability of these sensors incre...

Phase 1 SBIR

Agency: Army
Topic: A96-107
Budget: 11/05/96 - 05/05/97

Phase 2 SBIR

Agency: Air Force
Topic: AF95-241
Budget: 08/12/96 - 08/12/98

The performance evaluation of certain types of airborne radio frequency (RF) systems by ground test usually requires that the test be conducted in the security and reduced reflection and diffraction interference of an anechoic chamber like that of the Preflight Integration of Munitions and Electronic Systems (PRIMES). Depsite all efforts to red...

Phase 2 SBIR

Agency: Air Force
Topic: AF95-123
Budget: 06/04/96 - 12/04/98
PI: Kim Allen

A standard multispectral environment capable of supporting a wide variety of users is crucial to promoting widespread use of any standard modeling and simulation (M&S) architecture, such a J-MASS, and reusability among the players and player components developed for such an architecture. Implementing a standard multispectral environment wi...

Phase 1 SBIR

Agency: Air Force
Topic: AF95-123
Budget: 08/23/95 - 03/23/96
PI: Kim Allen

Phase 1 SBIR

Agency: Air Force
Topic: AF95-241
Budget: 05/10/95 - 11/10/95

Phase 2 SBIR

Agency: Air Force
Topic: AF92-157
Budget: 10/05/93 - 10/04/95

The Air Force Chief of Staff has directed program offices, operating commands, and test organizations to employ a disciplined test process throughout all phases of electronic Combat (EC) systems deelopment and modification. The EC test process consistss of disciplined early evaluaiton to determine if the system under development will meet user ...

Phase 1 SBIR

Agency: Air Force
Topic: AF92-157
Budget: 04/29/92 - 10/29/92

Phase 2 SBIR

Agency: Air Force
Topic: AF90-001
Budget: 06/05/91 - 06/05/93

The overall objective of the Airborne Antenna Pattern Prediction Program (A2P3) is to develop a general purpose, user-oriented analytical tool to provide a fast and cost effective means for the analysis of the electromagnetic radiation from antennas in the presence of complex structures such as aircraft. The free-space radiation patterns of ant...

Phase 1 SBIR

Agency: Air Force
Topic: AF90-001
Budget: 06/05/90 - 06/30/91

Load More