Amber Engineering, Inc.

5756 Thornwood Dr
Goleta, CA 93117
65 Employees

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $1.12MM
First Award Date 07/28/88
Most Recent Award Date 01/01/92

Key Personnel

Last Name Name Awards Contact
Blackwell John Blackwell 3

4 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 92-1
Budget: 01/01/92 - 12/31/92

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

SPACE BASED, LOW-BACKGROUND INFRARED MEASUREMENTS PRESENT STRINGENT PERFORMANCE REQUIREMENTS ON THE INFRARED DETECTOR ARRAYS AND THEIR ASSOCIATED READOUT MULTIPLEXER CIRCUITRY. VERY-LOW-TEMPERATURE CRYOGENICS ENVIRONMENTS (2 KELVIN) ARE REQUIRED BY THESE SYSTEMS TO ACHIEVE DETECTOR PERFORMANCE LEVELS. THESE CRYOGENICS ENVIRONMENTS POSE TECHNICAL...

Phase 2 SBIR

Agency: Air Force
Topic: AF88-077
Budget: 09/28/89 - 09/28/91

FORWARD LOOKING INFRARED (FLIR) SENSORS, TRADITIONALLY DESIGNED FOR USE BY HUMAN OPERATORS, ARE NOW BEING DEVELOPED FOR AUTOMATIC TARGET RECOGNITION (ATR) APPLICATIONS IN WHICH COMPUTERS ARE RESPONSIBLE FOR TARGET ACQUISITION TASKS. ADVANCED FLIR DESIGN AND PERFORMANCE FIGURES OF MERIT ARE ATTAINED THROUGH MODELS THAT HAVE NOT BEEN VERIFIED BEC...

Phase 1 SBIR

Agency: Air Force
Topic: AF88-077
Budget: 07/28/88 - 12/31/88