Mirage Systems, Inc.

2188 Bering Drive Array
San Jose, CA 95131
140 Employees

SBIR Award Summary

Total Number of Awards 7
Total Value of Awards $2.13MM
First Award Date 09/21/90
Most Recent Award Date 02/21/17

Key Personnel

Last Name Name Awards Contact
Harris James Harris 1
Barrick Dr. Donald E. Barrick 2
Moussally George Moussally 5 Message

7 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 19a
Budget: 02/21/17 - 11/20/17

Robust reactive transport models of subsurface hydrobiogeochemical processes are crucial to understanding complex subsurface systems. However, predictive capabilities of models that simulate coupled interactions within these systems are limited by accuracy and fidelity of properties populating or constraining the models. To improve these models’...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: ARPA93-034
Budget: 08/20/97 - 08/31/99

Difficult technical problems remain to be solved with innovative approaches before GPR technology realizes its full potential. Our Phase I project successfully demonstrated an innovative approach to 3-D imaging of buried targets with a stand-off GPR. The images were of small metal cylinders buried within .5m of the surface with the radar great...

Phase 1 SBIR

Agency: Army
Topic: A95-036
Budget: 04/08/96 - 10/08/96

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: ARPA93-034
Budget: 03/11/94 - 03/31/95

Phase 2 SBIR

Agency: Army
Topic: A90-057
Budget: 06/26/92 - 12/30/93

Phase I studies demonstrated that a BI-static sensor system operating in teh HF/VHF band could provide detectable levels of signal strength beyond, and below, the crest of hills and through foliage. The studies also showed that the RCS response of a typical helicopter was detectable and certain modulation characteristics were measureable in the...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB901-051
Budget: 05/01/91 - 12/01/92

AN ESCALATING WORLD WIDE PROLIFERATION OF SOPHISTICATED OFFENSIVE MILITARY HARDWARE, PLUS AN ONGOING SHIFT WITHIN DOD TOWARD WORLD WIDE CONTINGENCY EMPLOYMENT OF MOBILE SPECIAL OPERATIONS FORCES HAS CREATED A COMPELLING NEED WITHIN DOD FOR RELIABLE, AFFORDABLE, LIGHT WEIGHT, WIDE AREA BRILLIANT MINES FOR MOBILE PLATFORM AND PERIMETER PROTECTION ...

Phase 1 SBIR

Agency: Army
Topic: A90-057
Budget: 09/21/90 - 03/29/91