Olis Engineering

Po Box 408
Sedalia, CO 80135
7 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $378K
First Award Date 01/01/85
Most Recent Award Date 01/01/91

Key Personnel

Last Name Name Awards Contact
Lord Carter K. Lord 5

6 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

THE PURPOSE OF THIS PROJECT IS TO DEVELOP A TRUE CENTERLINE IMAGING MODULE FOR USE WITH EXTERNAL GRASPING END EFFECTORS. IT WILL DESIGN A CENTERLINE IMAGING SYSTEM FOR EXTERNAL GRASPING END EFFECTORS, FABRICATE A PROTOTYPE OF THE CENTERLINE IMAGING MODULE, AND PARTICIPATE IN THE TESTING OF THE SYSTEM AT NASA-MSFC. THE NEED FOR THIS TYPE OF IMAGI...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89

THE PURPOSE OF THIS PROPOSED RESEARCH IS TO DEVELOP A TRUE CENTERLINE IMAGING SYSTEM FOR USE WITH END EFFECTOR TOOLS. THE NEED FOR THIS TYPE OF IMAGING SYSTEM WAS IDENTIFIED DURING THE COURSE OF A PREVIOUS STUDY TO DEVELOP INFLATABLE END EFFECTORS FOR HANDLING DELICATE COMPOSITE STRUCTURAL COMPONENTS. ONE OF THE INFLATABLE END EFFECTOR TOOLS DEV...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-2
Budget: 01/01/87 - 12/31/87

THE PROPOSED CONCEPT STUDY WILL RESULT IN THE CONCEPTUAL DESIGN OF SEVERAL END EFFECTOR SYSTEMS WHICH REGULATE AND DISTRIBUTE THE LOADS GENERATED IN HANDLING STRUCTURAL ELEMENTS DURING SPACE ASSEMBLY OPERATIONS, AND AN EVALUATIONOF THE CONCEPTS DEVELOPED. CURRENT END EFFECTOR DESIGNS TRANSMIT CONCENTRATED LOADS TO THE STRUCTURAL MEMBERS HANDLED....

Phase 2 SBIR

Agency: Army
Topic: A85-072
Budget: 01/01/86 - 12/31/86

THE PROPOSED PHASE II RESEARCH WILL RESULT IN THE DESIGN, FABRICATION AND TESTING OF TWO WASTE PROCESSING UNITS (WPU's) - ONE SPECIFICALLY DESIGNED FOR USE IN THE CONCEPT COMMAND POST VEHICLE (CCPV), AND THE OTHER DESIGNED FOR COMMERCIAL AND MILITARY MARINE APPLICATIONS. A WPU TEST STAND WILL BE DESIGNED AND FABRICATED TO FACILITATE TESTING OF ...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 85-1
Budget: 01/01/85 - 12/31/85

Phase 1 SBIR

Agency: Army
Topic: A85-072
Budget: 01/01/85 - 12/31/85