Atss, Inc.

23456 MADERO, SUITE 230
Mission Viejo, CA 92691
10 Employees

SBIR Award Summary

Total Number of Awards 25
Total Value of Awards $4.77MM
First Award Date 01/01/87
Most Recent Award Date 06/01/92

Key Personnel

Last Name Name Awards Contact
Moody Henry L Moody 15
Groener Liam S Groener 8
UNDISCLOSED UNDISCLOSED 1
Paquette David G Paquette 1

25 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A89-049
Budget: 06/01/92 - 06/01/94

A engineering development program for a novel approach to heat flux measurement in the live fire testing environment is proposed. Multi-element pyroelectric film transducers provide simultaneous direct measurement of fast temperature and acoustic (shock wave or over pressure) transients, and accurate instantaneous heat flux, both the convective ...

Phase 2 SBIR

Agency: Air Force
Topic: AF90-024
Budget: 04/30/92 - 01/30/94

The objective of the program is to design, fabricate and deliver to AEDC probes that can accurately measure and map arc-jet exit plane flow quantities. Two rake probes shall be delivered, that can map out the aerodynamic properties of the test section in high-enthalpy/high-preassure arc-jets. The first probe shall be a duel-sonic nozzle enthal...

Phase 1 SBIR

Agency: Air Force
Topic: AF92-125
Budget: 04/23/92 - 11/23/92

Phase 1 SBIR

Agency: Navy
Topic: N91-082
Budget: 09/24/91 - 03/27/91

Phase 2 SBIR

Agency: Air Force
Topic: AF89-248
Budget: 04/02/91 - 04/30/93

ENGINE INLETS FOR HYPERSONIC VEHICLES ARE CRITICAL TECHNOLOGY AREAS BECAUSE OF THE POSSIBLE OCCURRENCE OF FOREBODY GENERATED SHOCKWAVE IMPINGEMENT, THE NEED FOR SHARP LEADING EDGE RADII AND THE REQUIREMENT OF MULTI-MISSION USE. IT IS THE INTENT OF THE PROPOSED PHASE II PROGRAM TO CONTINUE THE PHASE I INVESTIGATION OF THE COWL LEADING EDGE FOR N...

Phase 1 SBIR

Agency: Navy
Topic: N90-028
Budget: 08/12/90 - 02/12/91

Phase 2 SBIR

Agency: Air Force
Topic: AF88-215
Budget: 02/01/90 - 09/30/92

THE AIR FORCE HAS AN INTEREST IN SHAPE STABLE NOSETIPS FOR LOW DRAG ICBM DECOYS. PASSIVE NOSETIP CONCEPTS HAVE SIGNIFICANT STRUCTURAL AND FABRICATION ISSUES IN THIS APPLICATION. ACTIVE COOLED NOSETIP CONCEPTS SUCH AS THE TRANSPIRATION COOLED NOSETIP (TCNT) CAN OFFER GOOD SHAPE STABILITY AND STRENGTH IN A VARIETY OF AEROTHERMAL AND EROSIVE ENVI...

Phase 2 SBIR

Agency: Air Force
Topic: AF88-212
Budget: 02/01/90 - 09/30/92

THE DEFICIENCIES IN CURRENT ANTENNA WINDOW MATERIALS AND DESIGN METHODS RESTRICT THE PERFORMANCE GOALS OF CERTAIN ADVANCED AIR FORCE SYSTEMS. TO IMPROVE THE PERFORMANCE AND/OR EXPERIMENTAL EVALUATION OF ANTENNA WINDOWS AND THEREFORE IMPROVE OVERALL SYSTEM EFFECTIVENESS; MATERIAL FORMULATIONS, MATERIAL CONSTRUCTIONS, DESIGN METHODS AND TEST FACI...

Phase 1 SBIR

Agency: Navy
Topic: N90-230
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: Air Force
Topic: AF90-024
Budget: 01/01/90 - 12/31/90

Load More