Energy Compression Research Corp.

6355 NANCY RIDGE ROAD
San Diego, CA 92121
20 Employees

SBIR Award Summary

Total Number of Awards 31
Total Value of Awards $5.18MM
First Award Date 01/01/83
Most Recent Award Date 09/28/93

Key Personnel

Last Name Name Awards Contact
Page Dr. D J Page 2
S F Zucker Oved S F Zucker 8
Giorgi David Giorgi 3
Zucker Oved S.F. Zucker 13
S. F. Zucker Oved S. F. Zucker 1
Mcintyre I. Mcintyre 1
McIntyre Dr. Iain A. McIntyre 3

31 Awards Won

Phase 1 SBIR

Agency: Defense Threat Reduction Agency
Topic: DNA93-014
Budget: 09/28/93 - 03/28/94

Phase 2 SBIR

Agency: Army
Topic: A91-142
Budget: 06/30/93 - 12/30/94

ECR proposes to build and test a high power microwave source based on laser activated silicon switched (LASS) for Army eCM applications. The high power microwave source, wich operates at low impedance, will be coupled to an efficient impedance transformer to enable connection to the 50 Omega (nominal) input impedance of the antenna. THe source...

Phase 2 SBIR

Agency: Navy
Topic: N90-243
Budget: 11/12/92 - 11/12/94

ECR Corp. has developed to the proof-of principle stage an electro-optic shutter for protecting the eyes of submariners from the threat of a laser beam directed through the periscope. The major distinction between this approach and other approaches is in the method used to detect the incoming laser radiation and activate the electro-optic shutt...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: DARPA92-010
Budget: 06/05/92 - 12/05/92

Phase 2 SBIR

Agency: Army
Topic: A90-021
Budget: 05/29/92 - 12/31/93

Under a Phase I SBIR contract with Ft. Belvoir, ECR has structured a development program, including a Phase III Advanced Technology Demonstration (ATD), for a High Power Mircrowave system for countermine applications, which based on the use of light activated silicon switches (LASS). The advantages of the LASS HPM source include: a) the use of...

Phase 1 SBIR

Agency: Army
Topic: A91-142
Budget: 12/19/91 - 06/19/92

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB912-117
Budget: 12/09/91 - 06/15/92

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA89-005
Budget: 07/01/91 - 07/01/93

The Phase I effort was directed towards developing theoretical models to chose the optimum resistivity profile, the investigation of fabrication techniques to realize a resistivity gradient of the proper electrical and mechanical properties, and the fabrication of an actual resistivity gradient. The overall objective of this effort is to show t...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: SDIO91-005
Budget: 05/30/91 - 11/30/91

Phase 1 SBIR

Agency: Navy
Topic: N90-243
Budget: 02/05/91 - 10/05/91

Load More