Integrated Systems, Inc.

3260 Jay Street
Santa Clara, CA 95054
250 Employees

SBIR Award Summary

Total Number of Awards 31
Total Value of Awards $6.72MM
First Award Date 01/01/83
Most Recent Award Date 09/20/95

Key Personnel

Last Name Name Awards Contact
Pachter Dr. M Pachter 2
Shah Sunil C Shah 3
Walker Robert A Walker 6
Kosut Dr. Robert L Kosut 7
Gupta Naren K Gupta 3
Briggs M Michael Briggs 2
Emami-Naeini Abbas Emami-Naeini 4
Tahk Dr. Minjea Tahk 2
Mennon P K Mennon 1
Briggs Michael Briggs 1

31 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF94-189
Budget: 09/20/95 - 09/09/97

Modeling of semiconductor equipment is a prerequisite for advanced sensor-based real-time process control; however, models for control design differ from those used for studying the detailed physics of these systems. In Phase I, Integrated Systems, Inc. (ISI) demonstrated the feasibility of deriving a physically-based model of a Rapid Thermal P...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: ARPA93-048
Budget: 08/31/95 - 09/07/97

Concurrent engineering is the simultaneous design of the process and control system to improve equipment performance and development. In Phase I, Integrated Systems Inc. (ISI) demonstrated the feasibility of creating a software design tool for integration of a high-fidelity simulation and model-based process control algorithms for semicondu...

Phase 1 SBIR

Agency: Army
Topic: A94-095
Budget: 02/24/95 - 08/24/95

The objective of this proposal is to develop robust nonlinear control design methods based on available measurements and associated computational tools with emphasis on feedback linearizable systems. A mod-follower scheme is proposed as a design method that utilizes available measurements. Feasibility of developing the necessary tools for prop...

Phase 1 SBIR

Agency: Air Force
Topic: AF94-189
Budget: 05/11/94 - 11/11/94

Modeling of semiconductor equipment is a prerequisite for advanced sensor-based real-time process control. Models for control design differ from those used for studying the detailed physics of these systems. Integrated Systems, Inc. (ISI) proposes to investigate several different modeling approaches for control system design of semiconductor p...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: ARPA93-048
Budget: 03/31/94 - 08/31/94

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: DARPA92-038
Budget: 06/09/93 - 06/04/95

Process control would greatly benefit by merging recent advances in process modeling, sensor development, and computer-aided-control-engineering (CACE). The benefits would include increased yield and quality, improved productivity at lower costs, and increased manufacturing flexibility, i.e., to rapidly tune the manufacturing process to me...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: SDIO93-002
Budget: 04/14/93 - 10/14/93

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: DARPA92-038
Budget: 06/05/92 - 12/10/92

Phase 2 SBIR

Agency: Air Force
Topic: AF89-230
Budget: 09/24/91 - 08/31/93

THE SOON-TO-BE-DECOMMISSIONED MINUTEMAN II STAGE II (MMIIstgII) ROCKET MOTOR CAN BE USED AS A BOOSTER FOR A SOUNDING ROCKET IF IT CAN BE RETROFITTED WITH A THRUST VECTOR CONTROL (TVC) SUBSYSTEM THAT WORKS NEAR SEA LEVEL. A PHASE I SBIR EFFORT WAS ACCOMPLISHED TO DEFINE THE NEEDED MODULAR TVC SUBSYSTEM, WHICH EMPLOYS SECONDARYINJECTION OF HOT GA...

Phase 2 SBIR

Agency: Army
Topic: A87-001
Budget: 09/27/90 - 06/30/92

POINTING CONTROL OF A WEAPON SYSTEM MOUNTED ON A MOVING PLATFORM POSES GENERIC CONTROL PROBLEMS FOUND ON TO TANKS, HELICOPTERS, ARMORED VEHICLES, SHIPS AND SPACECRAFTS. THE PROPOSED ADAPTIVE CONTROL TESTBED PROVIDES TOOLS SO THAT VARIOUS CANDIDATE CONTROL METHODOLOGIES CAN BE TRIED OUT UNDER WELL DEFINED CONDITIONS. THE OBJECTIVE OF THE TESTBE...

Load More