LNR Communications, Inc.

180 Marcus Blvd
Hauppauge, NY 11788
225 Employees

SBIR Award Summary

Total Number of Awards 19
Total Value of Awards $3.72MM
First Award Date 01/01/83
Most Recent Award Date 06/02/92

Key Personnel

Last Name Name Awards Contact
Deely Richard M Deely 2
Degruyl Johannes A Degruyl 3
Degruyl H Degruyl 2
Gordon Robert Gordon 2
Gordon R Gordon 1
Gruyl J De Gruyl 1
Deely R Deely 1
Asmus Julius R Asmus 1
Richter Fred Richter 1
Cho Yung L. Cho 2
Ng Eric Ng 2
Degruyl J Degruyl 1

19 Awards Won

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB901-048
Budget: 06/02/92 - 12/15/93

PRESENT AND FUTURE SIGINT RECEIVING SYSTEMS MUST BE CAPABLE OF PROVIDING RAPIDLY TUNABLE FREQUENCY CONVERSION, SWITCHED-BANDWIDTH AND/OR CENTER FREQUENCY PREDETECTION IF AND/OR POST DETECTION BASEBAND FILTERING AND TRANSVERSAL QUALIZATION, INTERFERENCE EXCISION AND PROGRAMMABLE TIME DELAY IN THE TRANSMISSION PATHS OF ALL SIGNALS OF INTEREST IN O...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB901-048
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: Army
Topic: A90-028
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: Navy
Topic: N89-115
Budget: 11/06/89 - 12/31/89
PI: R Gordon

Phase 2 SBIR

Agency: Army
Topic: A88-101
Budget: 08/31/89 - 11/30/91

SPREAD SPECTRUM AND RELATED LOW PROBABILITY OF INTERCEPT (LPI) RADAR AND COMMUNICATIONS SIGNALS, BY VIRTUE OF THEIR BROAD BANDWIDTH, BELOW-NOISE-LEVEL SPECTRAL DENSITY, NOISE-LIKE SPECTRAL SHAPE, AND UNKNOWN CODE, ARE IMPOSSIBLE FOR AN INTERCEPT OR ESM RECEIVER TO DESPREAD AND RECOVER THE PURE INFORMATION BEARING SIGNAL EMBEDDED THEREIN. HOWEVE...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-2
Budget: 01/01/89 - 12/31/89
PI: Eric Ng

A PHASE 1 PROGRAM IS PROPOSED TO PERFORM A DESIGN STUDY TO DEMONSTRATE THE FEASIBILITY OF REALIZING A LOW COST KA-BAND (30 GHZ) REFLECTION MODE FET SOLID STATE POWER AMPLIFIER (SSPA), EXHIBITING A MINIMUM 16W RF OUTPUT POWER OVER AT LEAST 1GHZ OPERATING BANDWIDTH, FOR 30/20GHZ SATCOM UPLINK TRANSMITTER USAGE. THE PROPOSED SSPA WILL EXHIBIT, AT K...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89
PI: J Degruyl

THE EVOLUTION OF ADVANCED 30/20 GHZ SATCOM SYSTEMS FOR DEPLOYMENT IN THE LATE 1980'S AND EARLY 1990'S EMPHASIZES THE USE OF WIDEBAND PREDOMINANTLY DIGITAL TRAFFIC, SERVICINGMANY DISPERSED USER GROUND TERMINALS VIA A SINGLE SOPHISTICATED SATELLITE, OPERATED IN FREQUENCY OR TIME DOMAIN MULTIPLE ACCESS (FDMA OR TDMA) MODES. IN FACT, THE ADVANCED CO...

Phase 1 SBIR

Agency: Air Force
Topic: AF88-157
Budget: 08/05/88 - 12/31/88

Phase 1 SBIR

Agency: Army
Topic: A88-101
Budget: 01/01/88 - 12/31/88

Phase 1 SBIR

Agency: Navy
Topic: N88-244
Budget: 01/01/88 - 12/31/88
PI: R Deely

Load More