Band Lavis & Assoc., Inc.

900 Ritchie Highway, Suite 203
Severna Park, MD 21146
29 Employees

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $1.87MM
First Award Date 02/10/84
Most Recent Award Date 04/23/98

Key Personnel

Last Name Name Awards Contact
Wilkins Dan Wilkins 2
G U Band Edward G U Band 2
Goubault Philippe Goubault 2
Wilkins Daniel L Wilkins 2
Forstell Brian G. Forstell 1

9 Awards Won

Phase 1 SBIR

Agency: Navy
Topic: N98-080
Budget: 04/23/98 - 10/23/98

The LCAC Full-Mission Trainer (FMT) is providing a cost-effective tool for training LCAC operators in normal craft operation and casualty mode conditions. However, the FMT was never validated with full-scale LCAC test data. Rather, the feel of the FMT was "tuned" by adjusting tuning coefficients in response to inputs obtained from experienced ...

Phase 2 SBIR

Agency: Navy
Topic: N95-090
Budget: 01/07/97 - 01/06/99

A first-principle mathematical model, designed to analyze parametrically the whole-ship impact of advances in ship technology, is being developed to a level necessary to demonstrate feasibility as a result of a Phase I program of work. The model designated PASS for "Parametric Analysis of Naval Ship Systems" will be unique in as much as it ...

Phase 1 SBIR

Agency: Navy
Topic: N95-090
Budget: 11/01/95 - 05/01/96

Phase 1 SBIR

Agency: Navy
Topic: N94-202
Budget: 02/01/95 - 08/01/95

The shallow-water and surf-zone mine clearance mission is being addressed by existing U. S. Navy programs. The clearance of manmade obstacles from the surf-zone and beach comprises an equal priority for the amphibious assault mission in littoral warfare. The effectiveness of non-explosive obstacles to deter a U. S. amphibious assualt missi...

Phase 1 SBIR

Agency: Navy
Topic: N91-210
Budget: 09/17/91 - 03/17/92

Phase 2 SBIR

Agency: Army
Topic: A86-103
Budget: 01/01/88 - 12/31/88

PHASE-I WORK ON THE U.S. ARMY BELVOIR RD&E CENTER SBIR CONTRACT "STABLIZATION OF THE SHIP/LIGHTER INTERFACE" HAS RESULTED IN THE DEVELOPMENT OF A CONCEPTUAL DESIGN OF A SYSTEM THAT IS EXPECTED TO IMPROVE THE ARMY'S ABILITY TO OFFLOAD CONTAINERS TO LACV-30s OR SIMILAR LIGHTERS IN A JLOTS MISSION IN SEA-STATES UP TO AT LEAST 4 CONDITIONS. THE CUR...

Phase 1 SBIR

Agency: Army
Topic: A86-103
Budget: 01/01/86 - 12/31/86

Phase 2 SBIR

Agency: Navy
Topic: N83-049
Budget: 04/25/85 - 04/25/87

DURING PHASE I OF THIS EFFORT, IT WAS DEMONSTRATED THAT THE HALFCYCLE MATRIX (HACYM) METHOD PROVIDED A GRAPHIC MEANS OF DISPLAYING RANDOM DATA. THE DISPLAY ALLOWS THE NATURE OF THE DATA TO BE READILY CHARACTERIZED. FOR EXAMPLE, IN THE CASE OF SHIP LOADS AND MOTIONS, THE METHOD ALLOWS WAVE-INDUCED DATA TO BE CHARACTERIZED AS LINEAR OR NONLINEAR...

Phase 1 SBIR

Agency: Navy
Topic: N83-049
Budget: 02/10/84 - 12/31/84