Windrock Assoc.

44 OUTER DR
Oak Ridge, TN 37830
7 Employees

SBIR Award Summary

Total Number of Awards 5
Total Value of Awards $1.19MM
First Award Date 01/01/88
Most Recent Award Date 07/01/91

Key Personnel

Last Name Name Awards Contact
Kirkpatrick James F Kirkpatrick 4

5 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A88-115
Budget: 07/01/91 - 06/01/93

A program is proposed to design fabricate, test, and deliver 10 prototype, on-line, prognostic and diagnostic monitors to the U.S. Army. The on-board, microprocessor-based monitors will be able to detect incipinet engine diagnosis of the detected faults. The monitors will additionally be able to monitor lubricating oil quality (including detect...

Phase 2 SBIR

Agency: Navy
Topic: N88-070
Budget: 01/10/91 - 12/31/91

A CONTINUATION OF A SUCCESSFUL PHASE I DEVELOPMENT EFFORT IS PROPOSED. IN PHASE I WE WERE ABLE TO DETECT FINE CRACKS, SUBTLE DIFFERENCES IN PART DENSITY, AND SUBTLE DIFFERENCES IN PART DIMENSIONS. THE PHASE II EFFORT WILL CULMINATE IN DELIVERY OF REFINED PROTOTYPE SYSTEM WITH AN AUTOMATED PART PLACEMENT CAPABILITY.

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

PRIMARY FLOWMETER CALIBRATION IS A PROBLEM FACED BY A WIDE RANGE OF INDUSTRIES, AS WELL AS NASA, A LITTLE-KNOWN FLOW MEASUREMENT METHOD--THE GIBSON OR PRESSURE-TIME--WILL BE APPLIED TO FLOWMETER CALIBRATION. THE MAJOR ADVANTAGE OF THE METHOD IS THAT IT IS A FUNDAMENTAL MEANS OF MEASURING MASS FLOW THAT CAN BE IMPLEMENTED IN A CLOSED-LOOP CALIBRA...

Phase 1 SBIR

Agency: Navy
Topic: N88-070
Budget: 01/01/88 - 12/31/88

Phase 1 SBIR

Agency: Army
Topic: A88-115
Budget: 01/01/88 - 12/31/88