Advanced System Technologies, Inc.

12200 E. Briarwood Avenue, Suite 260
Englewood, CO 80112
16 Employees

SBIR Award Summary

Total Number of Awards 23
Total Value of Awards $4.4MM
First Award Date 01/01/85
Most Recent Award Date 08/31/95

Key Personnel

Last Name Name Awards Contact
Brehm Eric Brehm 2
Dudzik William F Dudzik 1
Ball Duane R Ball 2
Pazirandeh Mohsen Pazirandeh 1
Krasovec George L Krasovec 2
GOETTGE GOETTGE 1
Wright Gary J Wright 2
Goettge Dr. Robert T Goettge 10

23 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N92-085
Budget: 08/31/95 - 08/31/97

Increasing Navy use of mission-critical computer systems results in stringent requirements for real-time performance, reliability, and cost. Designers must analyze systems across many dimensions to identify critical design components and initiate design changes that meet numerous requirements simultaneously. These mission-critical distributed ...

Phase 2 SBIR

Agency: Navy
Topic: N93-089
Budget: 12/21/94 - 12/21/96

Dependability is an increasingly critical charactreristic of the Navy's mission critical computer systems. These systems must be maintained in a state of readiness to support critical mission function s, and must be able to perform these functions correctly despite the presence of faultsd in system components, and in the environments in whi...

Phase 1 SBIR

Agency: Navy
Topic: N93-138
Budget: 02/01/94 - 07/31/94

Phase 2 SBIR

Agency: Navy
Topic: N90-180
Budget: 09/30/93 - 09/30/95

Use of real-time computing in Navy systems is increasing, including the use of distributed computing. Real-time operating system services provide an Interface between application software and the hardware. Requirements for real-time performance, reliability/fault tolerance, and security must be addressed by a these services. Use of complex op...

Phase 1 SBIR

Agency: Navy
Topic: N93-089
Budget: 06/22/93 - 12/22/93

Phase 1 SBIR

Agency: Navy
Topic: N92-085
Budget: 08/21/92 - 02/21/93
PI: GOETTGE

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 92-2
Budget: 01/01/92 - 12/31/92
PI: Unavailable

THE MOST CRITICAL DEFICIENCY WITH CASE PRODUCTS AS APPLIED TO TIME-CRITICAL SOFTWARE DESIGN IS THEIR INABILITY TO ADEQUATELY SUPPORT THE TRADE-OFF PROCESS INVOLVING TIMING AND PERFORMANCE ISSUES. ONLY A FEW OF THE SO-CALLED REAL-TIME TOOLS SUPPORT THE ALLOCATION AND BUDGETING OF TIMING REQUIREMENTS. NONE OF THE AVAILABLE CASE TOOLS PROVIDE THE U...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-2
Budget: 01/01/90 - 12/31/90

TIMING AND RELIABILITY PERFORMANCE ARE BECOMING INCREASINGLYCRITICAL CHARACTERISTICS OF EMBEDDED COMPUTER SYSTEM SOFTWARE. COMPLEX TRADEOFFS INVOLVING INTERACTIONS BETWEEN TIMING AND RELIABILITY PROPERTIES NEED TO BE MADE DURING DESIGN TO ENSURE THAT SYSTEMS WILL SATISFY STRINGENT PERFORMANCE REQUIREMENTS. THIS SBIR PROJECT WILL INVESTIGATE AN E...

Load More