Scientific Technology, Inc.

205 Perry Parkway Suite 14
Gaithersburg, MD 20877
45 Employees

SBIR Award Summary

Total Number of Awards 8
Total Value of Awards $1.89MM
First Award Date 01/01/87
Most Recent Award Date 09/29/97

Key Personnel

Last Name Name Awards Contact
Wang Ting-I Wang 5
Hsu Chung-Dyi Hsu 3

8 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A96-032
Budget: 09/29/97 - 09/29/99

Feasibility studies in Phase I indicate that a sensor using the turbulence-induced optical scintillation signal from an illuminated target can provide measurement of path-averaged crosswind speed between the shooter and the target. In Phase I, we have performed theoretical analysis, numerical calculation, engineering design, and experiment to d...

Phase 1 SBIR

Agency: Army
Topic: A96-032
Budget: 11/27/96 - 05/27/97

Phase 1 SBIR

Agency: Navy
Topic: N93-175
Budget: 07/13/94 - 01/13/95

Phase 2 SBIR

Agency: Army
Topic: A90-122
Budget: 03/05/92 - 03/05/94

Feasibility studies including analyses and experiments performed in Phase I indicte that ther is a suitable techique for producing small multi-layer wide band microstrip patch antennas for anartillery proximity fuze application. In Phase II, Scientific Technoloyg, Inc. will continue the effort to develop low cost and reliable fabrication techni...

Phase 1 SBIR

Agency: Army
Topic: A90-122
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: Army
Topic: A89-052
Budget: 05/04/89 - 12/31/89

Phase 2 SBIR

Agency: Army
Topic: A87-90
Budget: 01/01/89 - 12/31/89

SATURATION EFFECT LIMITS THE PRESENT OPTICAL SCINTILLOMETER TO MEASURE PATH PROFILE OF THE ATMOSPHERIC REFRACTIVE TURBULENCE TO 1 KM OR LESS. THE PROPOSED TECHNOLOGY MAKES THE SCINTILLOMETER OPERATING EVEN IN THE SATURATION REGIME. PHASE I RESULTS INDICATE THAT A SECOND GENERATION OPTICAL SCINTILLOMETER WOULD MEASURE ATMOSPHERIC TURBULENCE INT...

Phase 1 SBIR

Agency: Army
Topic: A87-90
Budget: 01/01/87 - 12/31/87