FAR West Sensor Corp.

12891 WESTERN AVENUE, SUITE F
Garden Grove, CA 92641
4 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $2.03MM
First Award Date 09/11/89
Most Recent Award Date 08/01/96

Key Personnel

Last Name Name Awards Contact
Otis Craig H. Otis 4
Lewis Steve M. Lewis 2

6 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF94-239
Budget: 08/01/96 - 08/01/98

Dentists use amalgam from capsules containing up to 400 mg of mercury for tooth restoration. According to recent studies in Europe and USA, dental waste water is a large source of mercury in the sewer system. Consequently, it's necessary to treat the dental waste water before discharge to sewer system. Dental waste water contains insolub...

Phase 1 SBIR

Agency: Air Force
Topic: AF94-239
Budget: 01/27/95 - 07/27/95

The current US Air Force High Speed Test Track SPOT velocity measurement system needs improvement in several areas to increase its operational readiness and reduce premission setup time. Far West Sensor Corp. has developed an innovative system concept using fiber optic links to couple magnetic sensors at the track to data capture electronics. ...

Phase 2 SBIR

Agency: Air Force
Topic: A91-233
Budget: 05/16/94 - 05/16/96

This project aggressively addresses the development of the Impact Detection System (IDS) into an operation sensor system for use in metric scoring of targets at the High Speed Test Track at Holloman AFB. Based upon the results of phase I, prototype hardware and software are to be developed and used to study the sensor characteristics and finali...

Phase 1 SBIR

Agency: Army
Topic: A91-233
Budget: 01/16/92 - 06/12/92

Phase 2 SBIR

Agency: Air Force
Topic: AF89-011
Budget: 10/11/90 - 06/30/96

A FIBER OPTIC APPROACH IS PROPOSED TO PROVIDE HIGHLY ACCURATE POSITION-TIME MEASUREMENTS OF ROCKET SLEDS AT THE HOLLOMAN AFB HIGH SPEED TEST TRACK. TIME RESOLUTION AND ACCURACY OF 1 MICROSECOND IS POSSIBLE WITH THIS SYSTEM AS DEMONSTRATED IN PHASE I WITH A SET OF PROTOTYPE SENSORS. THE PHASE I RESULTS AGREED WELL WITH TIME MEASUREMENT SYSTEMS ...

Phase 1 SBIR

Agency: Air Force
Topic: AF89-011
Budget: 09/11/89 - 12/31/89