Ocean & Atmospheric Science, Inc.

145 Palisade Street
Dobbs Ferry, NY 10522
18 Employees

SBIR Award Summary

Total Number of Awards 13
Total Value of Awards $1.8MM
First Award Date 01/01/84
Most Recent Award Date 04/23/96

Key Personnel

Last Name Name Awards Contact
Williams Dr. Ross E Williams 7
Cotton Dr. Frederick Cotton 2
Cotton Dr. Fredrick Cotton 2
Williams Ross E Williams 1
Barney William C. Barney 1

13 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF96-203
Budget: 04/23/96 - 04/23/98

Phase 2 SBIR

Agency: Navy
Topic: N89-144
Budget: 12/24/90 - 12/24/92

A SYSTEM DESIGN AND PERFORMANCE EVALUATION IS PROPOSED FOR AN ACTIVE BISTATIC SONOBUOY SURVEILLANCE SYSTEM OPERATING IN THE PRESENCE OF STRONG SELF-INTERFERENCE. OPTIMUM BUOY DEPLOYMENT CONFIGURATIONS WITH RESPECT TO PROJECTOR AND TARGET TRACK LOCATIONS WILL BE SPECIFIED. THE PRESENT IMPULSE RESPONSE MODEL FOR INTERFERENCE AND ECHO ARRIVALS WI...

Phase 1 SBIR

Agency: Navy
Topic: N89-144
Budget: 01/01/89 - 12/31/89

Phase 2 SBIR

Agency: Navy
Topic: N85-129
Budget: 05/01/87 - 05/01/89

A DESIGN IS PROPOSED FOR A CRYOGENIC ACOUSTIC PROJECTOR FOR LOW FREQUENCY UNDERSEA COMMUNICATIONS OR SURVEILLANCE OVER LONG DISTANCES. ALTERNATIVELY THIS VIBRATIONAL POWER SOURCE COULD BE USED TO TEST THE PHYSICAL INTEGRITY OF STRUCTURES, TO DRIVE PILINGS, OR FOR OTHER INDUSTRIAL APPLICATIONS. ITS UNIQUE FEATURE IS A VERY HIGH POWER-TOWEIGHT RA...

Phase 1 SBIR

Agency: Navy
Topic: N87-057
Budget: 01/01/87 - 12/31/87

Phase 1 SBIR

Agency: Navy
Topic: N87-108
Budget: 01/01/87 - 12/31/87

Phase 2 SBIR

Agency: Navy
Topic: N84-109
Budget: 08/30/86 - 08/30/88

ELECTRONIC MODULES THAT CAN BE FAULTED BY REMOTELY CONTROLLED SWITCHING ARE POTENTIALLY VALUABLE AIDS IN THE TRAINING OF OPERATING AND MAINTENANCE PERSONNEL IN THE RECOGNITION AND DIAGNOSIS OF FAILURES AND PERFORMANCE DEGRADATION IN COMPLEX ELECTRONIC SYSTEMS. OAS, INC., PROPOSES AN INVESTIGATION OF LOW-LEVEL MICROWAVE AND SUPERSONIC SWITCHING D...

Phase 1 SBIR

Agency: Navy
Topic: N86-155
Budget: 01/01/86 - 12/31/86

Phase 1 SBIR

Agency: Navy
Topic: N85-129
Budget: 08/30/85 - 12/31/85

Phase 1 SBIR

Agency: Army
Topic: A85-094
Budget: 01/01/85 - 12/31/85

Load More