Advanced Composite Products, Inc.

37 WASHINGTON AVENUE
E. Haven, CT 06512
68 Employees

SBIR Award Summary

Total Number of Awards 20
Total Value of Awards $4.07MM
First Award Date 01/01/83
Most Recent Award Date 01/01/90

Key Personnel

Last Name Name Awards Contact
Maass David Maass 19
Hoon Douglas Hoon 1

20 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A87-031
Budget: 01/01/90 - 12/31/90

IN A PHASE I CONTRACT, ACP DEMONSTRATED THAT FABRICS MADE FROM COMMINGLED THERMOPLASTIC COMPOSITE YARNS COULD BE USED TO FABRICATE COMPLEX INTEGRATED HELICOPTER STRUCTURE. THIS OFFERS THE POTENTIAL FOR LOW COST, DAMAGE TOLERANT AIRFRAME STRUCTURE IN UPCOMING APPLICATIONS SUCH AS LHX. HOWEVER, ONE OF THE CURRENT LIMITS TO ACHIEVING THIS GOAL HA...

Phase 1 SBIR

Agency: Army
Topic: A89-016
Budget: 12/20/89 - 12/31/89

Phase 2 SBIR

Agency: Army
Topic: A86-097
Budget: 09/01/89 - 01/01/92

A PHASE I FEASIBILITY STUDY HAS DEMONSTRATED THAT THERMOPLASTIC COMPOSITES SUCH AS GLASS/PPS CAN PROVIDE SUBSTANTIAL WEIGHT SAVINGS FOR THE ARMY'S ACCESS/EGRESS ROADWAY SURFACE HARDWARE WHILE ALSO MEETING OPERATIONAL REQUIREMENTS. PRELIMINARY TESTING WAS VERY ENCOURAGING, INDICATING THAT THE SIMPLE, INTEGRALLY MOLDED PANEL DESIGN MET STRUCTURAL...

Phase 1 SBIR

Agency: Navy
Topic: N88-073
Budget: 01/01/88 - 12/31/88

Phase 2 SBIR

Agency: Army
Topic: A85-053
Budget: 01/01/87 - 12/31/87

THE OBJECTIVE OF THIS EFFORT IS TO FURTHER DEVELOP AND VERIFY THE STRUCTURAL DESIGN OF A THERMOPLASTIC COMPOSITE BRIDGE DECK INITIATED UNDER THE PHASE I PRELIMINARY DESIGN. CONTINUOUS FIBER REINFORCED THERMOPLASTIC COMPOSITES (TPC) ARE IDEALLY SUITED FOR THE TRI-ARCH BRIDGE DECK APPLICATION FOR A NUMBER OF REASONS. TPC'S OFFER SIGNIFICANT WEIG...

Phase 2 SBIR

Agency: Air Force
Topic: AF86-162
Budget: 01/01/87 - 12/31/87

A PHASE I FEASIBILITY STUDY HAS DEMONSTRATED THAT CONFORMABLE THERMOPLASTIC COMPOSITE FABRICS SUCH AS GRAPHITE/PEEK CAN BE USED IN THE FABRICATION OF COMPLEX SHAPED AIRCRAFT STRUCTURAL HARDWARE WITH POTENTIAL FOR SIGNIFICANT LABOR SAVINGS AS COMPARED WITH STANDARD RAW MATERIAL FORMS SUCH AS APC-2. THE EFFORT PROPOSED HEREIN IS DESIGNED TO BUILD...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA87-012
Budget: 01/01/87 - 12/31/87

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA87-013
Budget: 01/01/87 - 12/31/87

Phase 1 SBIR

Agency: Navy
Topic: N87-077
Budget: 01/01/87 - 12/31/87

Phase 1 SBIR

Agency: Army
Topic: A87-031
Budget: 01/01/87 - 12/31/87

Load More