Tetra Corp.

3701 Hawkins Street, NE
Albuquerque, NM 87109
36 Employees

SBIR Award Summary

Total Number of Awards 57
Total Value of Awards $9.92MM
First Award Date 01/01/83
Most Recent Award Date 01/26/96

Key Personnel

Last Name Name Awards Contact
Moeny William M. Moeny 21
Elixondo Ms. Juan M. Elixondo 1
Young Chris M. Young 9
Gray Dr. E W Gray 4
Elizondo Dr. Juan M Elizondo 6
Rodriguez A E Rodriguez 2
MOENY Mr. MOENY 1
Touryan Dr. K J Touryan 1
Touryan Dr. Kenell J Touryan 5
White F. Eugene White 1
White Michael G. White 1
Curry Randy Curry 1
McDonald Kenneth F. McDonald 1
Cravey William R. Cravey 1
friberg George j friberg 3

57 Awards Won

Phase 1 SBIR

Agency: Navy
Topic: N95-177
Budget: 01/16/96 - 07/16/96

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: BMDO96-001
Budget: 01/01/96 - 12/31/96

Phase 1 SBIR

Agency: Navy
Topic: N95-014
Budget: 09/29/95 - 03/29/96

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: DARPA93-019
Budget: 09/12/94 - 03/12/95

Phase 2 SBIR

Agency: Defense Threat Reduction Agency
Topic: DNA91-015
Budget: 09/22/93 - 04/22/95

Repetitive, high current switching in high voltage systems represents a major challenge to the switching community. The requirements for long life, fast recovery, high voltage hold-off, high current, high rate of current rise, and long conduction times are difficult to satisfy with a single device. The pseudospark switch has been shown to sati...

Phase 2 SBIR

Agency: Navy
Topic: N90-062
Budget: 07/06/93 - 07/06/95

The detection and localization phases of airborne ASW have, in the past, relied heavily on passive sonobuoy systems. As modern nuclear submarines are made quieter, interest is growing in alternative active adjuncts to the passive sonobuoys. This Phase II proposal is to develop the Laser Generated Sonar (LGS) Technology to generate sound with o...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: SDIO93-005
Budget: 06/02/93 - 07/02/93

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: SDIO93-002
Budget: 05/18/93 - 11/18/93

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1993
Budget: 01/01/93 - 12/31/93

THERE ARE MULTIPLE APPLICATIONS FOR COMPACT PARTICLE ACCELERATORS, ESPECIALLY HIGH ENERGY [TENS OF MEV] AND HIGH CURRENT [KA] OUTPUT. GRADIENTS OF 10 TO 20 MV/M ARE POSSIBLE ONLY WITH RF ACCELERATORS. EXISTING LINEAR INDUCTION ACCELERATORS (LIAS) DO NOT OPERATE AT OVER 1 MV/M. RESEARCHERS ARE DEVELOPING AN INSULATOR TECHNOLOGY TO SUPPRESS AND EN...

Load More