Fastmetrix, Inc.

906 Sommerset Rd.
Huntsville, AL 35803
8 Employees

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $1.49MM
First Award Date 04/19/95
Most Recent Award Date 09/03/98

Key Personnel

Last Name Name Awards Contact
Kamerman Gary W. Kamerman 4
Hitt Eugene A. Hitt 2

4 Awards Won

Phase 2 STTR

Institution: Fisk University

Agency: Missile Defense Agency
Topic: BMDO96T001
Budget: 09/03/98 - 09/02/00

The spectral correlator receiver in Phase II will provide sensitivity for remote chemical detection for a variety of applications, including: Strategic Defense, conventional military, Special Operations, law enforcement, civil defense, and civilian commercial applications. Laser radar which utilizes this concept, could effectively and reliably ...

Phase 1 STTR

Institution: Alabama A&M University

Agency: Missile Defense Agency
Topic: BMDO96T001
Budget: 07/31/96 - 12/31/96

Successful completion of ballistic missile defense engagement requires the verification of intercept and complete destruction of enemy warheads with non-negative impacts to defended areas. Current engagement operational concepts address kill assessment requirements mainly using radar surveillance of intended intercept regions within the battles...

Phase 2 SBIR

Agency: Army
Topic: A94-100
Budget: 06/30/96 - 07/31/98

Electromagnetic Launchers are being developed by all branches of the U.S. Military. Furthermore, extensive research and development have been conducted into armature and projectile design. Detailed knowledge of the velocity and acceleration experienced by the projectile as a function of time and position as it travels down the barrel of the la...

Phase 1 SBIR

Agency: Army
Topic: A94-100
Budget: 04/19/95 - 10/19/95

This effort will develop and demonstrate the design of a Doppler-based laser radar system to measure in-bore velocity of a projectile accelerated by an electromagnetic launcher. The system will measure the absolute velocity at 30 microsecond intervals for a duration of at least 30 milliseconds. The velocity measurement resolution will be at le...