Fantastic Data LLC

207 Prospect Avenue
San Francisco, CA 94110
http://www.fandat.com
4 Employees

SBIR Award Summary

Total Number of Awards 7
Total Value of Awards $1.93MM
First Award Date 04/07/00
Most Recent Award Date 04/26/07

Key Personnel

Last Name Name Awards Contact
Hammel Mr. Thomas Hammel 6 Message
Rich Mr. Mark Rich 1 Message

7 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF071-077
Budget: 04/26/07 - 01/28/08

The Department of Defense is planning to develop an IP-based Airborne Network (AN) to interconnect mobile airborne platforms with existing and planned space and terrestrial networks. Network services, such as, name to address translation, dynamic address assignment, and time synchronization are essential to the smooth operation of the internet a...

Phase 1 SBIR

Agency: Army
Topic: A05-123
Budget: 11/10/05 - 05/09/06

The objective of Phase 1 is to develop and validate the requirements and design for a specialized wireless backbone data backhaul network to support a wide variety of sensors deployed across vast areas. The specialized nature of the backbone network-support for low-power sensor nodes, vast coverage areas, limited access, autonomous operation, an...

Phase 2 SBIR

Agency: Army
Topic: A03-081
Budget: 11/17/04 - 11/17/06

During Phase 1, we designed and simulated the Spatially Redundant (SPRED) link layer protocol to overcome the problems caused by blockage in satellite on the move communication systems. Our objective during Phase 2 is to test, validate, and demonstrate the operation of the protocol on prototype hardware. The link layer protocol provides reliable...

Phase 1 SBIR

Agency: Army
Topic: A03-081
Budget: 01/08/04 - 07/08/04

The primary objective of Phase 1 of the proposed project is to design a ground-based protocol to provide reliable and efficient communication services by overcoming the problems associated with fading and blockage by terrain obstacles. The protocol will address both voice and data communication. In particular, the protocol must overcome the low ...

Phase 2 SBIR

Agency: Army
Topic: A02-101
Budget: 11/24/03 - 11/24/05

We propose to develop an integrated medium access control and routing protocol suite for a very large wireless network of simple sensors. The protocol suite is designed for low power uses and for implementation in VLSI. The protocol suite is designed, simulated, and tested on a large network of prototype hardware during Phase 2 of the project.Th...

Phase 1 SBIR

Agency: Army
Topic: A02-101
Budget: 12/20/02 - 11/10/03

Fantastic Data proposes to develop an integrated medium access control and routing protocol suite for a very large wireless network of simple sensors. The protocol suite is designed for low power uses and for implemenation in VLSI. The protocol suite is designed, simulated and tested on a large network during Phase 1 of the project. The propose...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: BMDO00-010
Budget: 04/07/00 - 10/06/00

We propose to develop a tool that determines the correct partitioning of a common information space to minimize a composite cost function based on the organization's policies. Cost function components include storage limits or cost, transmission limits or cost, and information criticality. The proposed tool can gather usage statistics over a per...