MATECH Advanced Materials

31304 Via Colinas, Suite 102 Array
Westlake Village, CA 91362
http://www.matechgsm.com
23 Employees

SBIR Award Summary

Total Number of Awards 67
Total Value of Awards $24MM
First Award Date 06/25/96
Most Recent Award Date 08/01/16

67 Awards Won

Phase 1 SBIR

Agency: Army
Topic: A16-004
Budget: 08/01/16 - 02/28/17

In this Army Phase I SBIR program, MATECH proposes to develop high strain-to-failure composites that significantly outperform current polymer matrix composites used in Army helicopters, notably to replace IM7/8552 composites. If Successful, these new composites will have significantly higher strain-to-failure (~5 percent), higher specific streng...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA15-002
Budget: 12/17/15 - 12/16/17

MATECH proposes to develop a cutting edge lightweight thermal insulator composite material for use in next generation solid rocket motoer (SRM) and compact divert and attitude control systems (DACS) in order to increase kinematic reach and containment in next generation Missile Defense systems. MATECH will optimize both components of its propos...

Phase 1 SBIR

Agency: Army
Topic: A15-008
Budget: 08/28/15 - 02/27/16

In this Phase I SBIR program, MATECH proposes to demonstrate production of continuous carbon fibers from a domestically sustainable rayon fiber precursor as a drop-in replacement for legacy viscose rayon based fiber in extreme Ultra High Temperature (UHT) Solid Rocket Motor (SRM) nozzles. The SRM industry has identified rayon precursor fiber as ...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA13-003
Budget: 01/01/15 - 12/31/15

The overall objective of this proposed program extends and increases the performance of MATECH?s light-weight, low cost, breakthrough Carbon Fiber reinforced Zirconium Oxy-Carbide ceramic matrix (Cf/ZrOCm) structural insulator with refractory seal coatings for current and future generation threat-interceptor Solid/Throttleable Divert and Attitud...

Phase 2 SBIR

Agency: Navy
Topic: N131-072
Budget: 01/01/15 - 12/31/15
PI: J. A.

In this Navy Phase II SBIR Program, MATECH proposes to leverage its lengthy experience in ceramic matrix composite (CMC) fabrication with recent advances in Field Assisted Sintering Technology (FAST) to demonstrate dramatic cost reduction and improved CMC performance. FAST is also known as ?Spark Plasma Sintering? (SPS). FAST can consolidate mat...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA12-035
Budget: 09/22/14 - 09/18/16

MATECH s ultra-high-temperature, dimensionally stable structural insulator material, a C(fiber)/ZrOC(matrix) ceramic composite material system, is a high performance structural insulator technology. The phase I effort identified life-cycle storage and non-operational aging events. Deleterious response to stress/deformation and thermal shock we...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA12-035
Budget: 01/01/14 - 12/31/14

MATECH"s ultra-high-temperature, dimensionally stable structural insulator material, a C(fiber)/ZrOC(matrix) ceramic composite material system, is a high performance structural insulator technology. The phase I effort identified life-cycle storage and non-operational aging events. Deleterious response to stress/deformation and thermal sho...

Phase 1 SBIR

Agency: Navy
Topic: N131-072
Budget: 05/08/13 - 03/07/14

In this Navy Phase I SBIR Program, MATECH proposes to leverage its lengthy experience in ceramic matrix composite (CMC) fabrication with recent advances in Field Assisted Sintering Technology (FAST) to demonstrate dramatic cost reduction and improved CMC performance. FAST is also known as Spark Plasma Sintering (SPS). MATECH proposes to team w...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA12-035
Budget: 03/06/13 - 09/13/13

In this MDA Phase I SBIR program, MATECH proposes to demonstrate the life cycle sustainability of ultra-high temperature (UHT), very low erosion, carbon fiber zirconium oxy-carbide ceramic matrix composite (Cf-ZrOCm CMC), developed under prior MDA SBIR funding, for advanced aerostructures with integrated thermal protection systems (TPS). This C...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA08-020
Budget: 01/31/13 - 05/05/14

In process for public release

Load More