Plastronic, Inc.

35 Mary-Bill Dr.
Troy, OH 45373
3 Employees

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $1.72MM
First Award Date 01/01/84
Most Recent Award Date 09/07/99

Key Personnel

Last Name Name Awards Contact
Tomsic Michael Tomsic 7
tomaic Michael tomaic 1

9 Awards Won

Phase 2 STTR

Institution: Oak Ridge National Laboratory

Agency: Missile Defense Agency
Topic: BMDO97T003
Budget: 09/07/99 - 09/07/01

For Military (Air Force, Navy, and Army) requirements for small and efficient cryopower generators and motors, YBCO high temperature superconductors on textured substrates offer great potential for high efficiency and low weight for these applications. This Phase II BMDO-SBIR-STTR investigation will develop the several processing methods identi...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1999
Budget: 01/01/99 - 12/31/99
PI: Unavailable

Not Available Increased awareness of health effects caused by airborne contaminants has incurred increased use of various kinds of air filters. However, filters for the specific application as identified in the solicitation of this SBIR topic are not currently available. Moreover, filter development often faces a technical dilemma between the t...

Phase 2 SBIR

Agency: Department of Energy
Topic: 1998
Budget: 01/01/98 - 12/31/98

171

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1998
Budget: 01/01/98 - 12/31/98

Phase 1 STTR

Institution: Lockheed Martin Energy Research Corp.

Agency: Missile Defense Agency
Topic: BMDO97T003
Budget: 09/08/97 - 03/07/98

For BMDO requirements for small and efficient cryopower, generators and power cables. YBCO on textured substrates high temperature superconductors offers a great potential for high efficiency and low weight for these applications. Current densities up to 1,000,000 amps/cm2 have been demonstrated on short samples. To obtain these current densitie...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1997
Budget: 01/01/97 - 12/31/97

171

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: BMDO97-005
Budget: 01/01/97 - 12/31/97

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1987
Budget: 01/01/87 - 12/31/87
PI: Unavailable

CURRENTLY GAS METAL ARC WELDING AND FLUX CORED ARC WELDING HAS THE LIMITATION THAT FOR A GIVEN WIRE DIAMETER, THE PROCESS HAS A GIVEN MINIMUM AND MAXIMUM WIRE FEED SPEED RANGE TO OBTAIN A CONSISTENT STABLE ARC. DUE TO THIS RANGE LIMITATION THERE ARE LIMITATIONS ON THE DEPOSITION RATE, HEAT INPUT, AND TRAVEL SPEED. IF THE AMPERAGE AT THE ARC COUL...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1984
Budget: 01/01/84 - 12/31/84

THERE IS A NATIONAL NEED FOR A LOW CAPITAL EQUIPMENT AND LOW OPERATING COST SURFACE HARDENING PROCESS AS COMPARED TO LASER, ELECTRON BEAM, AND INDUCTION HARDENING. BY LOWERING THE COST OF SURFACE HARDENING MORE PARTS THAT WEAR OUT DUE TO FRICTION CAN BE SURFACED HARDENED TO INCREASE THEIR USEFUL LIFE. THE OBJECTIVE OF THIS RESEARCH IS TO MAKE IN...