LNK Corp., Inc.

6811 Kenilworth Avenue, Suite 306
Riverdale, MD 20737
32 Employees

SBIR Award Summary

Total Number of Awards 40
Total Value of Awards $8.97MM
First Award Date 01/01/83
Most Recent Award Date 11/21/00

40 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A98-040
Budget: 11/21/00 - 01/01/05

Optically transparent components for lasers, envelopes for vapor lamps and infrared transparent domes for missiles require a multi-mode system of electromagnetic guidance. In recent years efforts have been concentrated on maximizing the resolution of optical materials for use in high-energy laser systems by minimizing the absorption of irradiate...

Phase 1 SBIR

Agency: Navy
Topic: N00-017
Budget: 03/07/00 - 09/07/00

LNK Corporation, Inc., in conjunction with JRM Enterprises, Inc. and MultiGen,proposes to develop a wavelet compression library which will be able to supportOpen GL and Direct 3D rendering on commercially available low cost PC boards.This library will extend LNK's existing wavelet compression algorithms, whichhave been used to compress hyperspec...

Phase 2 SBIR

Agency: Office of the Secretary of Defense
Topic: OSD98-014
Budget: 01/15/99 - 01/15/01

The placement of hyperspectral sensors on future spacecraft and unmanned air vehicles is constrained by a data bottleneck caused by limited downlink bandwidth. This proposal addresses this problem by developing a computationally efficient, lossless compression algorithm that is optimized for hyperspectral imagery. In the Phase I, we used a hybri...

Phase 1 SBIR

Agency: Army
Topic: A98-040
Budget: 12/18/98 - 12/30/00

Army Command and Control facilities need the ability to function more effectively, with smaller staffs spread over a geographically dispersed area. Their staff officers must fully comprehend a constantly changing environment, assessing the potential presence, magnitude, and intentions of threats. They must also constantly monitor and evaluate th...

Phase 1 SBIR

Agency: Office of the Secretary of Defense
Topic: OSD98-014
Budget: 04/10/98 - 10/10/98

The placement of hyperspectral sensors on future Unmanned Air Vehicles is constrained by a data bottleneck caused by the limited downlink bandwidth. This proposal addresses this problem by developing a lossless compression algorithm that is optimized for hyperspectral imagery. Hyperspectral imagers generate 3-D data whose two axes correspond t...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 98-1
Budget: 01/01/98 - 12/31/98
PI: Unavailable

Phase 2 SBIR

Agency: Navy
Topic: N95-178
Budget: 09/26/97 - 03/29/98

DoD and the Navy specifically are looking to improve the efficiency and effectiveness of training programs through the integration of Intelligent Computer Based Training System (ICBTS) technology. In the Phase I effort, LNK Corporation Successfully designed and prototyped a generic ICBTS authoring system, IntelliTeach. This Phase II effort see...

Phase 2 SBIR

Agency: Army
Topic: A95-047
Budget: 03/28/97 - 03/31/99

The objective of the proposed Phase II effort is to develop a biologically motivated Artifical Intelligence system that can perform outdoor landmark recognition in a software test bed or in operational navigation. In developing the system we follow two key steps; (1) interpret the given image scene by classifring all the natural terrain informat...

Phase 1 SBIR

Agency: Navy
Topic: N95-021
Budget: 08/05/96 - 02/05/96

Phase 1 SBIR

Agency: Air Force
Topic: AF96-121
Budget: 05/03/96 - 02/03/97

Load More