Iowa Thin Film Technologies, Inc.

2337 230th St
Boone, IA 50036
http://www.iowathinfilm.com
20 Employees

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $3.33MM
First Award Date 01/01/90
Most Recent Award Date 04/03/02

Key Personnel

Last Name Name Awards Contact
Jeffrey Frank Jeffrey 6 Message
grimmer Derrick grimmer 3

9 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF01-033
Budget: 04/03/02 - 07/01/04

Thin film photovoltaic (PV) modules fabricated on polymer substrates have a number of very attractive features for space use. Flexible a-Si modules: 1) have shown minimum degradation due to radiation; 2) can have low fabrication costs; 3) have demonstrated very high power to weight ratios; 4) have high tolerance to vibration and shock; 5) can b...

Phase 2 SBIR

Agency: Army
Topic: A00-162
Budget: 01/16/02 - 01/16/04

Demand for electrical power in portable and temporary installations continues to increase, which adds significant logistical burden in terms of weight, maintenance, and fuel demand. Power demands include command & control operations, medical operations, lighting, chemical/biological filtering, and communications. Iowa Thin Film Technologies ...

Phase 1 SBIR

Agency: Air Force
Topic: AF01-033
Budget: 03/27/01 - 02/28/02

Thin film photovoltaic modules fabricated on polymer substrates have a number of very attractive features for space use. Flexible a-Si modules: 1) have shown minimum degradation due to radiation; 2) can have low fabrication costs; 3) have demonstrated very high power to weight ratios; 4) have high tolerance to vibration and shock; 5) can be mon...

Phase 1 SBIR

Agency: Army
Topic: A00-162
Budget: 01/01/01 - 12/26/01

Demand for electrical power in portable and temporary installations continues to increase, which adds significant logistical burden in terms of weight, maintenance, and fuel demand. Power demands include command & control operations, medical operations, lighting, chemical/biological filtering, and communications. Iowa Thin Film Technologies ...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 92-1
Budget: 01/01/92 - 12/31/92

Phase 2 SBIR

Agency: Department of Energy
Topic: 1991
Budget: 01/01/91 - 12/31/91
PI: Unavailable

IF THIN FILM A-SI SOLAR CELLS ARE EVER TO MEET THEIR PROMISE OF LARGE AREA MANUFACTURE AT LOW COST, CERTAIN PROBLEMS MUST BE SOLVED. UNIFORM HIGH RATE DEPOSITION OF HIGH QUALITY, PINHOLE-FREE INTRINSIC LAYERS OVER LARGE AREAS IS ONE OF THOSE PROBLEMS. R&D ON IMPROVED REACTION CHAMBERS IS NEEDED FOR CONTROLLED FABRICATION OF LARGE AREA A-SI LAYER...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-2
Budget: 01/01/91 - 12/31/91

THERE IS A NEED IN SPACE POWER SYSTEM TECHNOLOGIES FOR FLEXIBLE, LIGHTWEIGHT SOLAR ARRAYS WITH SPECIFIC PERFORMANCEIN W/KG EXCEEDING BASELINE THIN SI DESIGN. A NEW TYPE OF AMORPHOUS SILICON SOLAR CELL IS PROPOSED IN WHICH THE DEVICES ARE FABRICATED AND MONOLITHICALLY INTERCONNECTED ON POLYIMIDE FILM, USING CONTINUOUS ROLL-TO-ROLL PROCESSES DDEVE...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1990
Budget: 01/01/90 - 12/31/90
PI: Unavailable

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90