Optimization Technology, Inc.

125 West Park Loop Suite 201
Huntsville, AL 35806
http://www.oti-hsv.com
49 Employees

SBIR Award Summary

Total Number of Awards 12
Total Value of Awards $2.75MM
First Award Date 01/01/84
Most Recent Award Date 06/01/02

Key Personnel

Last Name Name Awards Contact
Cox Mr. Robert C. Cox 4 Message
Welch Howard O Welch 1
A. R. Butler Dr. Roger A. R. Butler 2
Cepeda Sandra Cepeda 1
Matthews David Matthews 1
Parish Trace Parish 1
mcentire Paul l. mcentire 2

12 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N01-053
Budget: 06/01/02 - 12/30/05

OTI proposes to research, develop, validate and demonstrate the Runtime Evaluation and Prediction System (REPS) technologies providing the runtime prediction capability required in order to most effectively employ the Naval Simulation System (NSS) in a real-time course-of-action (COA) analysis role. The NSS is a discrete-event simulation-ba...

Phase 1 SBIR

Agency: Navy
Topic: N01-053
Budget: 06/01/01 - 12/01/01

OTI proposes to research and develop the Runtime Evaluation and Prediction System (REPS) technologies providing the advanced methodology, techniques and integrated tool suite required for the most effective utilization of existing simulation capabilities for real-time or near-real time course-of-action (COA) analysis. In rapidly changing enviro...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB972-078
Budget: 04/16/99 - 10/31/00

OTI proposes the development, validation, and demonstration of the Large-Scale Distributed/Parallel simulation (LDPsim) tool providing automated support for performance analysis and evaluation of very large-scale distributed computing systems. A powerful set of analysis tools, integrated into a flexible and extensible object oriented framework,...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB972-078
Budget: 09/29/97 - 05/31/98

Phase 2 SBIR

Agency: Air Force
Topic: AF95-038
Budget: 06/28/96 - 06/28/98

Computing and communications requirements to support modern C4I _ systems have undergone considerable expansion in the last decade. _ Requirements for C4I interoperability between the services, along _ with recent developments in C4I doctrine (such as C4I for the _ Warrior) will require far more sophisticated, more complex, and _ more heterogene...

Phase 1 SBIR

Agency: Air Force
Topic: AF95-038
Budget: 07/06/95 - 01/06/96

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: BMDO94-010
Budget: 03/28/94 - 09/28/94

OTI proposes to identify, research, prioritize, select and prove concept feasibility of techniques for testing concurrent, real-time, distributed, large-scale software during Phase I. A prototype proof-of-principle will be build during Phase II of this program by integrating test techniques selected during Phase I of this SBIR into OTI's existi...

Phase 1 SBIR

Agency: Air Force
Topic: AF93-109
Budget: 05/06/93 - 11/06/93

Phase 2 SBIR

Agency: Navy
Topic: N88-071
Budget: 12/13/91 - 12/23/93

OTI proposes to apply the Ads conversion methodology developed and demonstrated during Phase I to generate a Technology Insertion Plan for replacing the E-2C Airborne Tactical Data System (ATDS) Litton L-304 computer with either the VHSIC AN/AYK-I4 or the Control Data Corporation and to generate an executable Ada PDL design for the ATDS software...

Phase 1 SBIR

Agency: Navy
Topic: N88-071
Budget: 01/01/88 - 12/31/88

Load More