Micron Instruments

4509 Runway St.
Simi Valley, CA 93063
http://[email protected]
30 Employees

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $824K
First Award Date 01/30/02
Most Recent Award Date 03/10/03

Key Personnel

Last Name Name Awards Contact
Chelner Mr. Herbert Chelner 2 Message

2 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A01-166
Budget: 03/10/03 - 03/10/05

This Phase II proposal is for the implementation of existing technology for a solid rocket motor embedded case bond stress sensor with proven accuracy and long-term stability. Sensors will be installed into a suitable tactical motor design and testing will demonstrate that they do not effect the grain structural integrity and should determine t...

Phase 1 SBIR

Agency: Army
Topic: A01-166
Budget: 01/30/02 - 02/17/03

One of the important parameters required for solid grain motor health montitoring is case bond stress. It is also the most difficult parameter to measure. To be a health monitor, these sensors must be small so as not effect the performance of the motor. They must have very low thermal hysteresis and long term stability. Service life determinatio...