Advanced Solutions, Inc.

10822 W. Toller Drive, Suite 250
Littleton, CO 80127
http://www.go-asi.com
12 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $1.77MM
First Award Date 03/28/01
Most Recent Award Date 01/01/08

Key Personnel

Last Name Name Awards Contact
Bucher Mr. Allen W. Bucher 3 Message
Cuseo John A. Cuseo 1 Message

3 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 08-1
Budget: 01/01/08 - 12/31/08

NASA, the Department of Defense (DoD), and Commercial spacecraft programs have the desire to minimize program costs while continuing to ensure mission robustness and flexibility. The spacecraft system that is a cost driver throughout the program life cycle is the Command and Data Handling System (C&DH), along with the associated algorithms and ...

Phase 2 SBIR

Agency: Air Force
Topic: AF01-019
Budget: 06/30/02 - 09/30/04

The SBIR Phase I work uncovered that the most expensive and challenging aspects of multi-satellite projects are the ability to build and test the satellites in a simulated environment that provides a high fidelity validation in a distributed test-like-you-fly environment at a reasonable cost. Expanding on three of the four elements investigated...

Phase 1 SBIR

Agency: Air Force
Topic: AF01-019
Budget: 03/28/01 - 04/08/02

Both DOD and NASA have future missions that require the launch and deployment of an increasing number of single spacecraft, as well as multi-craft constellations. The desire to minimize cost and ensure the robustness of these high value assets has given rise to the need for on-orbit inter-satellite communications that provides redundancy and fa...