Mansour Engineering, Inc.

14 Maybeck Twin Dr.
Berkeley, CA 94708
5 Employees

SBIR Award Summary

Total Number of Awards 5
Total Value of Awards $1.09MM
First Award Date 12/22/91
Most Recent Award Date 05/10/01

Key Personnel

Last Name Name Awards Contact
Mansour Alaa Mansour 5 Message

5 Awards Won

Phase 1 SBIR

Agency: Navy
Topic: N01-061
Budget: 05/10/01 - 11/06/01

One of the principle objectives of the project is to reduce construction weight of the CVN(x) and similar naval vessels. With this in mind, it is important to consider all loads influencing members scantlings. Some of the member scantlings are governed by local rather than global loads. Because of this concern, both local and global environme...

Phase 2 SBIR

Agency: Navy
Topic: N93-067
Budget: 02/20/96 - 02/20/98

The principal objective of the project is to reduce the initial cost of construction of new USN ships. Specific objectives are (1) Develop new tolerances and structural detailing specifications for new construction (2) using an existing ship (specified) by NAVSEA) demonstrate the differences and similarities between existing and the new propose...

Phase 2 SBIR

Agency: Navy
Topic: N91-100
Budget: 02/12/94 - 02/02/96

The proposed work will provide a methodology for assessing the reliability relative to all important structural failure modes for existing ships and ship designs that are still on the drawing board. For a given ship, the computerized identified. System reliability analysis will be performed where appropriate. This methodology will be capable ...

Phase 1 SBIR

Agency: Navy
Topic: N93-067
Budget: 12/21/93 - 06/19/94

Phase 1 SBIR

Agency: Navy
Topic: N91-100
Budget: 12/22/91 - 06/22/92