Design_net Engineering LLC

16080 Table Mountain Parkway Array
Golden, CO 80403
http://www.design-group.com
35 Employees

SBIR Award Summary

Total Number of Awards 21
Total Value of Awards $9.57MM
First Award Date 09/05/03
Most Recent Award Date 06/17/16

Key Personnel

Last Name Name Awards Contact
Murphy Mr. Gerry Murphy 6 Message
Center Dr. Ken Center 8
Boncyk Mr. Wayne Boncyk 3 Message
Murphy Mr. Gerald Murphy 1 Message
Krosley Ramon Krosley 1
Marketos Louis Marketos 1 Message
Adams Tom Adams 5 Message
Babich David Babich 1 Message
Batch Ted Batch 1 Message

21 Awards Won

Phase 1 SBIR

Agency: Department of Defense
Topic: SB161-007
Budget: 06/17/16 - 03/16/17

The ability to place a modular, configurable platform in GEO which can accommodate payloads, provide them leasable services, and perhaps serve as a waystation for intermediate assembly prior to continuing on to an extended interplanetary mission would be a true game-changer for science and technology. Development of a business model for such a ...

Phase 2 SBIR

Agency: Air Force
Topic: AF121-068
Budget: 10/31/13 - 01/29/16

ABSTRACT: A key problem in the rapid and lower cost development of spacecraft is that the various devices that comprise the spacecraft bus do not typically provide a single standard interface and/or communications protocols. This forces a design-to-order paradigm in which a spacecraft bus is developed on a per-mission basis with little reuse of ...

Phase 1 SBIR

Agency: Air Force
Topic: AF121-068
Budget: 07/25/12 - 04/24/13

ABSTRACT: A key problem in the rapid and lower cost development of spacecraft is that the various devices that comprise the spacecraft bus do not typically provide a single standard interface and/or communications protocols. This forces a design-to-order paradigm in which a spacecraft bus is developed on a per-mission basis with little reuse of...

Phase 1 SBIR

Agency: Air Force
Topic: AF112-071
Budget: 12/21/11 - 12/12/12

ABSTRACT: Next generation highly autonomous space vehicles need certain key technologies in order to achieve their promised goals. Much time is spent in mission planning working out the details of daily activities of space vehicle so as to assure adequate power/energy margin. The more autonomous vehicle must be able to manage power in a proact...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 10-1-O2.01
Budget: 01/01/11 - 12/31/11

Access to space for Small Satellites is enabled by the use of excess launch capacity. An integration process that minimizes risk to the primary, allows parallel integration and predictable cost/schedule for the secondary enables use of that capacity. Design_Net has developed and flown a Falcon 1 RideShare Adapter (RSA) and is developing a RSA ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 10-2-S4
Budget: 01/01/10 - 12/31/10

Access to space for Small Satellites is enabled by the use of excess launch capacity on existing launch vehicles. A range of sizes, form factors and masses of small sats need to be accommodated. An integration process that minimizes programmatic/technical risk to the primary, allows "late flow" integration and predictable cost/schedule for the ...

Phase 1 SBIR

Agency: Navy
Topic: N091-089
Budget: 09/01/09 - 03/01/10

It takes up to 10 years to design, build and launch a satellite system. The satellite system reflects the 10-year-old (or more) outdated, inflexible technology and mission needs that may no longer be applicable to the tactics and geography of today s evolving conflicts. These new conflicts create the need for mission changes that cannot be accom...

Phase 1 SBIR

Agency: Air Force
Topic: AF083-196
Budget: 03/09/09 - 03/10/10

A repeating topic in aerospace discussion forums is the ever-increasing reliance on space assets to support our national infrastructure. Their vulnerability has led to significant discussion about how to facilitate better situational awareness and protection of these assets. As the space environment becomes more utilized the management effort wi...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 09-1
Budget: 01/01/09 - 12/31/09

The integrated design centers currently in place at the Goddard and Ames research institutions are highly productive infrastructures, allowing a group of domain specialists to rally for intense, focused intervals of time around a mission concept, refining a design in spiral fashion using a palette of trusted in-house and commercial engineering a...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 09-1
Budget: 01/01/09 - 12/31/09

DNet has been actively pursuing strategies for shortening the software development portion of the satellite development life-cycle for some time. We recognized upon analyzing the constituents of the traditional process that a disproportionate fraction of time is spent working with software that falls under one of two categories - developed from ...

Load More