THE Consulting Network, Inc.

209 Washington Street
Middletown, MD 21769
http://www.tcni.com
15 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $4.6MM
First Award Date 01/02/02
Most Recent Award Date 09/30/04

Key Personnel

Last Name Name Awards Contact
Pruitt Mr. Andre J. Pruitt 3 Message

3 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N01-150
Budget: 09/30/04 - 08/29/06

Any Total Ownership Cost (TOC) reduction initiative requires completion of a cost/benefit analysis, including the detailed preparation of a Life Cycle Cost (LCC) analysis. LCC models are often very labor intensive to complete with inputs that are typically derived from various engineering disciplines and/or existing databases. The proposed SBIR ...

Phase 2 SBIR

Agency: Navy
Topic: N01-150
Budget: 01/20/03 - 02/04/10

Any Total Ownership Cost (TOC) reduction initiative requires completion of a cost/benefit analysis, including the detailed preparation of a Life Cycle Cost (LCC) analysis. LCC models are often very labor intensive to complete with inputs that are typically derived from various engineering disciplines and/or existing databases. The proposed SBIR ...

Phase 1 SBIR

Agency: Navy
Topic: N01-150
Budget: 01/02/02 - 10/09/02

Any Total Ownership Cost (TOC) reduction initiative requires completion of a cost/benefit analysis, including the detailed preparation of a Life Cycle Cost (LCC) analysis. LCC models are often very labor intensive to complete with inputs that are typically derived from various engineering disciplines and/or existing databases. The proposed SBI...