Lasen, Inc.

300 N. Telshor - Suite 600
Las Cruces, NM 88011
http://www.laseninc.com
8 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $2.52MM
First Award Date 06/08/95
Most Recent Award Date 02/27/03

Key Personnel

Last Name Name Awards Contact
Geiger Mr. Allen R. Geiger 6 Message

6 Awards Won

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: AF95-125
Budget: 02/27/03 - 03/01/05

Presently, a need exists for compact mid-infrared sensors for various combat systems in the 21st century. Systems such as the Future Combat System (FCS) will require remote active multi-spectral sensors with combined capabilities of laser radar, remote chemical detection, and multi-spectral imaging. The mid-infrared spectral region offers enha...

Phase 1 SBIR

Agency: Army
Topic: A02-036
Budget: 02/07/03 - 08/06/03

The objective of this research is to construct an ultra-compact and lightweight mid-infrared differential absorption lidar (DIAL) sensor capable of operating from unmanned aerial vehicles (UAVs) and similar platforms. The sensor will operate in the 3.2--3.6-um spectral region, the fingerprint absorption region for many fuels and paints, as well ...

Phase 2 SBIR

Agency: Air Force
Topic: AF95-125
Budget: 09/30/97 - 09/30/99

The proposed effort will use the AN/GVS-5 rangefinder as a platform to construct a mid-infrared DIAL type lidar. An optical parametric oscillator laser (OPOL) will produce tunable infrared radiation in the 3-5 um region. The lidar receiver will employ an optical parametric amplifier (OPOL) to enhance the signal to noise ratio of the system. T...

Phase 2 SBIR

Agency: Air Force
Topic: AF95-125
Budget: 08/29/96 - 08/29/98

The proposed effort will use the AN/GVS-5 rangefinder as a platform to construct a mid-infrared DIAL type lidar. An optical parametric oscillator laser (OPOL) will produce tunable infrared radiation in the 3-5 um region. The lidar receiver will employ an optical parametric amplifier (OPOL) to enhance the signal to noise ratio of the syste...

Phase 1 SBIR

Agency: Air Force
Topic: AF96-116
Budget: 05/03/96 - 12/03/96

Phase 1 SBIR

Agency: Air Force
Topic: AF95-125
Budget: 06/08/95 - 01/08/96