Etherware, LLC

5250 South Virginia Street, Suite 340
Reno, NV 89502
5 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $170K
First Award Date 01/01/86
Most Recent Award Date 12/22/03

Key Personnel

Last Name Name Awards Contact
Tavormina Mr. Joseph Tavormina 1 Message
furlong Dale a. furlong 1
mycock John c. mycock 1

3 Awards Won

Phase 1 SBIR

Agency: Army
Topic: A03-115
Budget: 12/22/03 - 06/22/04

The proposed research is to develop an overall system design for a power- and bandwidth efficient satellite communication modem, a communication waveform and an associated Medium Access Control (MAC) protocol to realize efficiency improvements. In currently deployed networks a single modulation scheme is typically used to communicate with all th...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1990
Budget: 01/01/90 - 12/31/90
PI: Unavailable

MANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL ...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1986
Budget: 01/01/86 - 12/31/86

THE REDUCED ENTRAINMENT PRECIPITATOR (RES) WILL HAVE IMPROVED COLLECTION EFFICIENCY FOR DUSTS HAVING EITHER HIGH OR LOW ELECTRICAL RESISTIVITIES. THIS OBJECTIVE IS ACCOMPLISHED BY PROVIDING A POROUS, FABRIC COLLECTING SURFACE. A SMALL PORTION (TYPICALLY LESS THAN 20%) OF THE DIRTY GAS STREAM IS DRAWN THROUGH THE COLLECTED DUST CAKE AND THE POROU...