Advanced Energy Systems, Inc.

100 Forrestal Road, Unit E
Princeton, NJ 08540

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $1.86MM
First Award Date 01/01/14
Most Recent Award Date 01/01/14

Key Personnel

Last Name Name Awards Contact
Meidlinger David Meidlinger 1 Message
Bullis Robert Bullis 2 Message
Park Jangho Park 1 Message

2 Awards Won

Phase 2 SBIR

Agency: Department of Energy
Topic: 07B-2014
Budget: 01/01/14 - 12/31/14

Generation and preservation of high-brightness electron beam is a major challenge of accelerator R & amp;D for time-resolved chemical imaging applications due to the importance of space-charge in this operating regime. The space-charge forces play a fundamental role in emittance degradation and bunch lengthening within the gun and subsequent emi...

Phase 2 SBIR

Agency: Department of Energy
Topic: 03C-2014
Budget: 01/01/14 - 12/31/14

Modern synchrotrons are providing higher beam currents and demanding more RF power from the superconducting cavities. The maximum RF power available without beam is limited by the maximum power rating of the WR1800 waveguide RF ceramic window used in the fundamental power coupler. Operation at this maximum power limit is hampered by the fact t...