BMA Engineering, Inc.

11429 Palatine Drive
Potomac, MD 20854
http://www.bmaengineering.com
2 Employees

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $1.84MM
First Award Date 04/17/01
Most Recent Award Date 12/05/03

Key Personnel

Last Name Name Awards Contact
Ayyub Dr. Bilal M. Ayyub 6 Message

6 Awards Won

Phase 1 SBIR

Agency: Office of the Secretary of Defense
Topic: OSD03-028
Budget: 12/05/03 - 06/05/04

The objective of Phase I: identify and develop innovative methods for portraying information for decision makers so that data uncertainty and content are readily understood. The specific objectives of the proposed effort are: 1. Review the present practice of visualizing uncertainty in battlefield data; 2. Examine the use of various visualizat...

Phase 2 SBIR

Agency: Navy
Topic: N01-102
Budget: 04/04/03 - 04/04/05

The main objective of the Phase II work is (1) to further develop and refine the risk-based methodology for developing maintenance management strategies, (2) to develop, implement and test the software tool based on the methodology proposed, and (3) develop a guide on the use of the methodology and software with a case study. The primary produc...

Phase 2 SBIR

Agency: Navy
Topic: N01-061
Budget: 12/06/02 - 12/06/04

The objectives of Phase II are to develop guidelines for the reliability-based, weight-optimized design of primary structural components of aircraft carriers, such as the CVN(X), subjected to vertical and lateral wave loads. The guidelines will provide realistic, extreme primary hull girder load estimates necessary to facilitate the applic...

Phase 1 SBIR

Agency: Navy
Topic: N01-102
Budget: 05/21/01 - 11/17/01

The objective of Phase I is to develop a practical methodology and procedure for implementing risk in the decision-making process for structural maintenance and repair. The specific tasks needed to achieve these objectives of the proposed effort can be enumerated as follows: 1. Assessment of Existing Maintenance Strategies for Ship Structures t...

Phase 1 SBIR

Agency: Navy
Topic: N01-061
Budget: 05/11/01 - 11/07/01

The objectives of Phase I are to develop realistic, extreme primary hull girder loads necessary to facilitate the application of reliability-based methods for investigating the possibility of weight savings for aircraft carrier. In this study, an empirical-analytical methodology will be developed based on sea trials, spectral analysis and extre...

Phase 1 SBIR

Agency: Navy
Topic: N01-057
Budget: 04/17/01 - 10/14/01

The objectives of Phase I are to survey the use of doubler plates, and provide a methodology for developing quantitative technical rationale (criteria) for their design and their use limitations as a repair fix for surface ships. The specific tasks needed to achieve these objectives of the proposed effort can be enumerated as follows: 1. Identi...