Bco, Inc.

799 Middlesex Turnpike
Billerica, MA 01821
http://www.bco-inc.com
37 Employees

SBIR Award Summary

Total Number of Awards 7
Total Value of Awards $1.35MM
First Award Date 05/07/97
Most Recent Award Date 01/01/15

Key Personnel

Last Name Name Awards Contact
Petty Mr. Millard Petty 2 Message
Chirnitch Joseph Chirnitch 2
Schrage Mr. Martin Schrage 3 Message
Deshaies Roger E Deshaies 1 Message

7 Awards Won

Phase 1 SBIR

Agency: Department of Transportation
Topic: 15.1-FT1
Budget: 01/01/15 - 12/31/15

Braking Rate Monitoring and Warning System 3/9/2015 Driver inattention and inaction are a major cause for serious crashes. There is a need for a low cost auxiliary system to sense any rail vehicle approaching unsafely and alert drivers. The auxiliary system will provide some form of Human Machine Interface that may aggressively alert the train...

Phase 1 SBIR

Agency: Navy
Topic: N08-124
Budget: 09/12/08 - 03/12/09

BCO s Phase I goal is to design an Antenna Array and Beamformer for rotorcraft to adapt to a rugged COTS radar module that is in production in lots of 10,000 for use on automobiles. This automotive radar is a K-Band unit with a phased-array antenna that can be stepped through 140 degrees in azimuth and which provides 20-inch range resolution. ...

Phase 1 SBIR

Agency: Air Force
Topic: AF081-074
Budget: 05/20/08 - 02/28/09

BCO s Phase I goal is to design an electronic bumper for rotorcraft using a rugged COTS radar module that is in production in lots of 10,000 for use on automobiles. This automotive radar is a K-Band unit with a phased-array antenna that can be stepped through 140º in azimuth and which provides 20-inch range resolution. A chain of nine of the ra...

Phase 1 SBIR

Agency: Air Force
Topic: AF04-277
Budget: 05/13/04 - 02/13/05

This program has two related objectives. The first objective is to facilitate the development of XML schemas that will provide a standardized format for the interchange of ATE related data. This collection of schemas comprises the Automatic Test Markup Language (ATML). A working group consisting of industry and government organizations is curren...

Phase 1 SBIR

Agency: Navy
Topic: N00-102
Budget: 09/27/00 - 03/27/01

This SBIR's objective is to derive functional and interface requirements for the Resource Adapter Interface (RAI) within the Standard Environment for Test as defined in the Automatic Test Systems (ATS) Subdomain Annex of the Joint Technical Architecture (JTA), Version 3.1, dated 31 March 2000. It will establish a preliminary architecture and int...

Phase 2 SBIR

Agency: Air Force
Topic: AF97-241
Budget: 04/17/98 - 04/17/00

SBIR Topic AF97-241, Robotic Test Probe, addresses the problem of providing reliable automatic access to inaccessible signal test points on CCA's. Manuel probing is costly to implement, is subject to judgement errors and requires extensive operator interaction. BCO has successfully prototyped a Robotic Test Probe utilizing VXI/IEEE-488 COTS in...

Phase 1 SBIR

Agency: Air Force
Topic: AF97-241
Budget: 05/07/97 - 02/07/98