Poole Ventura, Inc.

321 Bernoulli Circle Array
Oxnard, CA 93030

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $405K
First Award Date 01/01/09
Most Recent Award Date 02/21/17

Key Personnel

Last Name Name Awards Contact
Poole Henry Poole 3 Message
CUSTER ARTHUR CUSTER 1 Message
Reitz Derek Reitz 1 Message

3 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 25d
Budget: 02/21/17 - 02/20/18

Electron clouds in accelerators limit machine performance through associated dynamical instabilities and/or vacuum pressure increases. High wall resistivity can cause heating and instabilities in accelerators. Coating accelerator vacuum tubes with compacted thick crystalline copper will mitigate those problems and can enhance luminosity. Develop...

Phase 1 SBIR

Agency: Department of Energy
Topic: 41 D-2013
Budget: 01/01/13 - 12/31/13

In-situ technique for coating of stainless steel vacuum tubes with Cu, to mitigate the problems of electron clouds and wall resistivity in accelerators trying to increase luminosity, was developed. Before coating the RHIC vacuum system with copper, it is imperative to test Cu coating conductivity at cryogenic temperatures to ensure coating effec...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2009
Budget: 01/01/09 - 12/31/09

Electron clouds in existing accelerators limit machine performance through dynamical instabilities and/or associated vacuum pressure increases. In addition, wall resistivity in accelerators causes ohmic heating and can lead to resistive wall instabilities. In situ coating of the stainless steel vacuum tubes with Cu and TiN could mitigate both ...