Particle Accelerator Corporation

809 Pottawatomie Trail
Batavia, IL 60515

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $165K
First Award Date 01/01/08
Most Recent Award Date 01/01/09

Key Personnel

Last Name Name Awards Contact
Mills Frederick Mills 2 Message
Johnstone Carol J. Johnstone 2 Message

2 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 2009
Budget: 01/01/09 - 12/31/09

With the U.S. experimental effort in high energy physics (HEP) largely dependent on the operation of highly specialized accelerators, the understanding and prediction of the performance of these accelerators becomes critical to the overall success of the DOE HEP program. A specific newly identified problem lies in the simulation and optimizatio...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2008
Budget: 01/01/08 - 12/31/08

Proton and light-ion accelerators have many research and medical applications, but the current state of technology in accelerators severely limits their widespread use: (1) synchrotrons have an intrinsic low duty cycle and become quite large for light ions; and (2) cyclotrons do not have energy variability and require complex superconducting mag...