Southwest Windpower, Inc.

1801 West Route 66
Flagstaff, AZ 86001

SBIR Award Summary

Total Number of Awards 1
Total Value of Awards $100K
First Award Date 01/01/08
Most Recent Award Date 01/01/08

Key Personnel

Last Name Name Awards Contact
Calley David Calley 1 Message
Greco Frank Greco 1 Message

1 Award Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 2008
Budget: 01/01/08 - 12/31/08

New tools, methods, and designs are needed to reduce manufacturing cost, improve speed of fabrication, and improve the quality of both large- and small-scale wind turbines. In previous work, it has been demonstrated that a small residential wind turbine can be designed and manufactured with a cost of energy that is comparable with average retail...