Fieldmetrics Inc.

13352 82nd Avenue
Seminole, FL 33776

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $3.15MM
First Award Date 01/01/04
Most Recent Award Date 01/01/10

Key Personnel

Last Name Name Awards Contact
Yakymyshyn Christopher P. Yakymyshyn 8 Message
Hamilton Pamela J. Hamilton 8 Message
Brubaker Michael A. Brubaker 1 Message
J. Pamela J. 1 Message

9 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 05 D-2010
Budget: 01/01/10 - 12/31/10

Significant upgrades are underway for the North American electric utility infrastructure in pursuit of the

Phase 2 SBIR

Agency: Department of Energy
Topic: 05 D-2010
Budget: 01/01/10 - 12/31/10

Significant upgrades are underway for the North American electric utility infrastructure in pursuit of the

Phase 1 SBIR

Agency: Department of Energy
Topic: 57 A-2010
Budget: 01/01/10 - 12/31/10

Significant upgrades are underway for the North American electric utility infrastructure in pursuit of the

Phase 2 SBIR

Agency: Department of Energy
Topic: 2007
Budget: 01/01/07 - 12/31/07

Because investment in the United States power grid infrastructure has not kept pace with increased energy demands, existing power lines must operate close to conservative safety limits. In order to improve efficiency and maintain reliability, advanced sensors are needed to provide measurements of critical power line parameter to utility operator...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2006
Budget: 01/01/06 - 12/31/06

Because investment in the United States power-grid infrastructure has not kept pace with increased energy demands, existing power lines must operate close to conservative safety limits. Advanced instrumentation can simultaneously improve efficiency and maintain reliability by enabling true dynamic rating, identifying grid operational instabilit...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2006
Budget: 01/01/06 - 12/31/06

The data storage market constitutes a sizeable and rapidly growing facet of the world economy, and worldwide data storage needs are growing at an unprecedented rate. New technologies are needed to keep up with the demand for affordable, efficient, and permanent (archival) digital storage. This project will develop a new type of data storage sy...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2005
Budget: 01/01/05 - 12/31/05

78897S Plasma fusion research experiments require magnetic field measurements over a wide range of bandwidth and sensitivity. However, existing pickup coil sensors are limited in bandwidth, require time integration, and perturb the experiment when used as inserted diagnostics. Novel sensors that can be used for edge or insertion measurements o...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2005
Budget: 01/01/05 - 12/31/05

78846S Investment in the U.S. power grid infrastructure has not kept pace with increased energy demands, and consequently, existing power lines must operate close to conservative safety limits. The development of advanced instrumentation could simultaneously improve efficiency and maintain reliability. Next generation sensors must be low-cost ...

Phase 1 SBIR

Agency: Department of Homeland Security
Topic: 2004
Budget: 01/01/04 - 12/31/04

An advanced monitoring system is proposed to improve the security and reliability for the electric utility power grid. Next generation sensor platforms deployed across distribution and transmission systems will communicate in real-time with a central monitoring hub via a secure wireless network. The advanced monitoring system will provide a back...